My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/22/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 09/22/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:07:00 PM
Creation date
10/7/2020 4:16:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/22/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />ENGINEERS ESTIMATE FOR <br />HAMPTON TOWNHOMES <br />SCHEDULE A: HELIUM COURT <br />ITEM NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />UNIT PRICE <br />EXTENSION <br />1 <br />MOBILIZATION <br />1 <br />LUMP SUM <br />$12,000.00 <br />$12,000.00 <br />2 <br />CLEARING <br />2.3 <br />ACRES <br />$2,500.00 <br />$5,750.00 <br />3 <br />GRUBBING <br />2.3 <br />ACRES <br />$2,500.00 <br />$5,750.00 <br />4 <br />REMOVE PAVEMENT MARKER <br />39 <br />LIN FT <br />$2.00 <br />$78.00 <br />5 <br />REMOVE BITUMINOUS PAVEMENT <br />26 <br />SO YD <br />$10.00 <br />$260.00 <br />6 <br />REMOVE CONCRETE PAVEMENT <br />71 <br />SQ YD <br />$10.00 <br />$710.00 <br />7 <br />REMOVE CONCRETE CURB AND GUTTER <br />50 <br />LIN FT <br />$8.00 <br />$400.00 <br />8 <br />REMOVE POWER POLES, GUY WIRES AND OVERHEAD LINES <br />1 <br />LUMP SUM <br />$3,500.00 <br />$3,500.00 <br />9 <br />REMOVE CULVERT <br />64 <br />LIN FT <br />$10.00 <br />$640.00 <br />10 <br />REMOVE RC APRON <br />1 <br />EACH <br />$200.00 <br />$200.00 <br />11 <br />REMOVE FOUR BUILDINGS <br />1 <br />LUMP SUM <br />$15,000.00 <br />$15,000.00 <br />12 <br />SAW BITUMINOUS PAVEMENT <br />88 <br />LIN FT <br />$4.00 <br />$352.00 <br />13 <br />SAW CONCRETE CURB AND GUTTER <br />5 <br />LIN FT <br />$5.00 <br />$25.00 <br />14 <br />REMOVE EXISTING SANITARY MANHOLE <br />1 <br />EACH <br />$500.00 <br />$500.00 <br />15 <br />SAND FILL EXISTING 8 INCH SANITARY SEWER <br />393 <br />LIN FT <br />$5.00 <br />$1,965.00 <br />16 <br />PLUG 8 INCH PVC PIPE <br />2 <br />EACH <br />$50.00 <br />$100.00 <br />17 <br />SUBGRADE PREPARATION - STREET <br />10.6 <br />ROAD STA <br />$1,000.00 <br />$10,600.00 <br />18 <br />SUBGRADE PREPARATION - TRAIL <br />10.2 <br />ROAD STA <br />$200.00 <br />$2,040.00 <br />19 <br />SALVAGE AND REPLACE TOPSOIL <br />1 <br />LUMP SUM <br />$5,000.00 <br />$5,000.00 <br />20 <br />SITE EXCAVATION AND GRADING <br />1 <br />LUMP SUM <br />$20,000.00 <br />$20,000.00 <br />21 <br />AGGREGATE BASE CLASS 5 MODIFIED - STREET (CV) (P) <br />330 <br />CU YD <br />$32.00 <br />$10,560.00 <br />22 <br />AGGREGATE BASE CLASS 5 MODIFIED - TRAIL (CV) (P) <br />114 <br />CU YD <br />$32.00 <br />$3,648.00 <br />23 <br />COMMON BORROW (LV) <br />4,425 <br />CU YD <br />$10.00 <br />$44,250.00 <br />24 <br />MILL BITUMINOUS SURFACE (1.5") <br />10 <br />SQ YD <br />$25.00 <br />$250.00 <br />25 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,B) 1.5" THICK <br />2,310 <br />SQ YD <br />$8.00 <br />$18,480.00 <br />26 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) 2.0" THICK <br />2,307 <br />SQ YD <br />$10.00 <br />$23,067.78 <br />27 <br />TYPE SP 12.5 WEARING COURSE MIXTURE (3,B) 2.5" THICK- TRAIL <br />957 <br />SQ YD <br />$14.00 <br />$13,391.78 <br />28 <br />TACK <br />140 <br />GALLON <br />$5.00 <br />$700.00 <br />29 <br />CONNECT TO EXISTING STORM SEWER <br />1 <br />EACH <br />$1,500.00 <br />$1,500.00 <br />30 <br />12" RC PIPE APRON <br />3 <br />EACH <br />$800.00 <br />$2,400.00 <br />31 <br />15" RC PIPE APRON <br />2 <br />EACH <br />$850.00 <br />$1,700.00 <br />32 <br />TRASH GUARD FOR 12" PIPE APRON <br />3 <br />EACH <br />$800.00 <br />$2,400.00 <br />33 <br />TRASH GUARD FOR 15" PIPE APRON <br />2 <br />EACH <br />$850.00 <br />$1,700.00 <br />34 <br />12" RC PIPE SEWER DESIGN 3006 CLASS V <br />153 <br />LIN FT <br />$25.00 <br />$3,825.00 <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.