Laserfiche WebLink
Unit of <br />Government <br /> <br />METC-- Environmental <br />Services <br /> <br />METC <br /> <br />MPC A <br /> <br />Army Corps of <br />Engineers <br /> <br />Type of Application <br /> <br />Sanitary sewer extension <br />permit <br />Watermain extension permit <br />Sanitary Sewer Connection <br />Plan Approval. <br />MUSA Extension <br />Comprehensive Plan <br />Amendment <br />Storm ·Water Construction <br />Activity National Pollutant. <br />Discharge Elimination <br />System (Clean Water Act <br />Section 402) <br />Wetland Permit <br /> <br />To be applied for. <br /> <br />To be applied for. <br />To be applied for. <br /> <br />To be applied for.- <br />To be applied for. <br /> <br />To be applied for. <br />To be applied for.' <br /> <br />Status <br /> <br />Describe current and recent past land use and development on the site and on adjacent <br />lands. Discuss project comPatibili~ with adjacent and nearby land uses. Indicate <br />whether any potential conflicts involve environmental maEers. Identi~ any potential <br />environmental hazards due to past site uses, such as soil contamination or abandoned <br />storage tanks, or proximity to nearby hazardous liquid or gas pipelines. <br /> Cu~ently, potions of the site are being mad for a~cul~l p~oses, ~d other potions have been ~ed ~ <br /> sam~gravel piB. The site is si~ated west of the Tom Center.. <br /> The project is compatible with the existing residential and co~ercial develoPments on adjacent 1~. ~e <br /> s~ounding land ~e is zoned residential and rural rese~e on the no~ and noahe~t sides. To ~e southe~t is the <br /> Town Center. On ~e west and no~hwest sides, the ~ea is zoned for a Planned Unit D~elopment (multi-me - <br /> residential and co~ercial). US Highway 10 ~ along the south border of the project site, ~nd to the south of the <br /> h.ighway the land is zoned residential. <br /> A Phase I Environmental Site ~ses~ent w~ conducted by ~efic~ En~neehng Testing, ~c., dated October 7, <br /> 2004. No previo~ environmental h~ar~ such ~ s0il con,nation, ab~doned stor~e t~s or pipelines are <br /> k~own to be present on-site. <br /> <br />Estimate the acreage of the site with each of the following cover types before and a~er <br />development. If before and aEer totals are not equal, explain why. <br /> <br /> Before - After Before After . <br />Types 1-8 20 20 Lawn/landscaping 0 . 75 <br />wetlands ' <br />Woocled/fi~ rest 20 5 Im pervio us 15 63 <br /> surfaces <br />Brush/grassland 60 25 ..;., Other (describe) 0 2 <br />Cropland 75 0 <br /> <br />Total 190 190 <br /> <br />-423- <br /> <br /> <br />