My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/20/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 10/20/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:38 AM
Creation date
10/16/2020 9:14:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/20/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. 3021-125 <br />"(II) to the extent actions involving the <br />development or acquisition of power generation are <br />included, renewable energy technologies (including <br />hydropower); and <br />"(III) regional economic development; <br />"(iii) the potential costs and timeline for the actions <br />recommended under this subparagraph; <br />"(iv) provisions for modifying the actions and <br />timeline to adapt to new information or circumstances; <br />and <br />"(v) a description of public input regarding the <br />proposed actions, including — <br />"(I) input from water users that have covered <br />power use; and <br />"(II) the degree to which those water users <br />concur with the recommendations.". <br />(b) EFFECT. —None of the amendments made by this section— <br />(1) modify any authority or obligation of the United States <br />with respect to any tribal trust or treaty obligation of the <br />United States; <br />(2) create or determine any water right or affects any <br />water right or water right claim in existence on the date of <br />enactment of this Act; or <br />(3) authorize the use of Federal funds for the physical <br />deconstruction of the Iron Gate, Copco 1, Copco 2, or John <br />C. Boyle Dam located on the Klamath River in the States <br />of California and Oregon. <br />SEC. 4309. CERTAIN BUREAU OF RECLAMATION DIKES. <br />(a) IN GENERAL. -Notwithstanding any other provision of law <br />(including regulations), effective beginning on the date of enactment <br />of this section, the Federal share of the operations and maintenance <br />costs of a dike described in subsection (b) shall be 100 percent. <br />(b) DESCRIPTION OF DiiEs.-A dike referred to in subsection <br />(a) is a dike— <br />(1) that is owned by the Bureau of Reclamation on the <br />date of enactment of this section; <br />(2) the construction of which was completed not later than <br />December 31, 1945; <br />(3) a corrective action study for which was completed not <br />later than December 31, 2015; and <br />(4) the construction of which was authorized by the Act <br />of June 28, 1938 (52 Stat. 1215, chapter 795). <br />SEC. 4310. AUTHORITY TO MAKE ENTIRE ACTIVE CAPACITY OF <br />FONTENELLE RESERVOIR AVAILABLE FOR USE. <br />(a) IN GENERAL. -The Secretary of the Interior (referred to <br />in this section as the "Secretary"), in cooperation with the State <br />of Wyoming, may amend the Definite Plan Report for the <br />Seedskadee Project authorized under the first section of the Act <br />of April 11, 1956 (commonly known as the "Colorado River Storage <br />Project Act") (43 U.S.C. 620), to provide for the study, design, <br />planning, and construction activities that will enable the use of <br />i11 n+nr9rro r'rifv (oc mov 110 rlofinorl nr 1 rn fnrl lry lorrol <br />
The URL can be used to link to this page
Your browser does not support the video tag.