My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/20/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 10/20/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:38 AM
Creation date
10/16/2020 9:14:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/20/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. 3021-55 <br />1910 (36 Stat. 633), and the Act of July 3, 1930 (46 Stat. 919), <br />and lying upstream of a line commencing at point N627942.09, <br />E879709.18 thence running southwesterly about 125 feet to a point <br />N627832.03, E879649.91 is no longer authorized beginning on the <br />date of enactment of this Act. <br />SEC. 1307. DELAWARE RIVER NAVIGATION PROJECT. <br />Section 1131(3) of the Water Resources Development Act of <br />1986 (100 Stat. 4246) is amended by striking "ten feet" and inserting <br />"35 feet". <br />SEC. 1308. COMPREHENSIVE EVERGLADES RESTORATION PLAN, CEN- <br />TRAL AND SOUTHERN FLORIDA, EVERGLADES AGRICUL- <br />TURAL AREA, FLORIDA. <br />(a) AUTHORIZATION. —Subject to subsection (b), the Secretary <br />is authorized to carry out the project for ecosystem restoration, <br />Central and Southern Florida, Everglades Agricultural Area, <br />Florida, in accordance with section 601 of the Water Resources <br />Development Act of 2000 (114 Stat. 2680), as recommended in <br />the addendum to the Central Everglades Planning Project Post <br />Authorization Change Report, Feasibility Study and Draft Environ- <br />mental Impact Statement prepared by the South Florida Water <br />Management District and dated May 2018, with such modifications <br />as the Secretary considers appropriate. <br />(b) REQUIREMENT.— <br />(1) IN GENERAL. —The project authorized by subsection (a) <br />may be constructed only after the Secretary prepares a report <br />that addresses the concerns, recommendations, and conditions <br />identified by the Secretary in the review assessment titled <br />"Review Assessment of South Florida Water Management Dis- <br />trict's Central Everglades Planning Project, Section 203 Post <br />Authorization Change Report, Integrated Feasibility Study and <br />DRAFT Environmental Impact Statement (March 2018, <br />Amended May 2018)" and dated May 2018. <br />(2) EXPEDITED COMPLETION. —The Secretary shall expedite <br />the completion of the report under paragraph (1) and shall <br />complete such report not later than 90 days after the date <br />of enactment of this section. <br />(c) CONSULTATION. —In reviewing the report identified in sub- <br />section (a), and completing the report identified in subsection (b), <br />the Secretary shall consult with the South Florida Water Manage- <br />ment District on any project modifications. <br />(d) CONSIDERATION. —Nothing in this section shall be construed <br />to delay the design, construction, and implementation of components <br />and features of the project for ecosystem restoration, Central Ever- <br />glades, authorized by section 1401(4) of the Water Resources <br />Development Act of 2016 (130 Stat. 1713), that are not directly <br />affected by the project authorized by subsection (a). <br />SEC. 1309. KISSIMMEE RIVER RESTORATION, FLORIDA. <br />The Secretary may credit work performed or to be performed <br />by the non -Federal sponsor of the project for ecosystem restoration, <br />Kissimmee River, Florida, authorized by section 101(8) of the Water <br />Pocmirroc novo1nnmonf Arf of 1009 (1(1C. dRfl91 . n in- <br />
The URL can be used to link to this page
Your browser does not support the video tag.