Laserfiche WebLink
CC Special Work Session <br />Meeting Date: 10/20/2020 <br />Title: <br />Review Draft Feasibility Study for Centralized Water Treatment Plant <br />Purpose/Background: <br />The purpose of this case is to receive a presentation from Chris Larson with SEH, Inc. on the draft City of Ramsey <br />Centralized Water Treatment Facility Study. A link will be sent via email to SEH's FTP (file transfer) site to allow a <br />copy of the draft study to be downloaded for review prior to the special work session. The presentation will touch <br />on the broader topics within the study, along with the primary findings and recommendations, after which <br />approximately 30 minutes will be reserved for a question and answer session. <br />Timeframe: <br />Staff anticipates 90 minutes will be needed for the presentation and the question and answer session. <br />Funding Source: <br />Funding sources for these improvements will be determined at a later date. <br />Responsible Party(ies): <br />City Staff will introduce the case, after which Chris Larson with SEH will make a formal presentation. <br />Outcome: <br />Recommendations and next steps will be discussed during the presentation. <br />Ramsey WTP Feasibility Study Revised c <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 10/15/2020 02:32 PM <br />Form Started By: Bruce Westby Started On: 10/09/2020 04:03 PM <br />Final Approval Date: 10/15/2020 <br />