Laserfiche WebLink
CC Special Work Session <br />Meeting Date: 07/21/2020 <br />Title: <br />Review Draft Feasibility Study for Centralized Water Treatment Facility <br />Purpose/Background: <br />The purpose of this case is to receive a presentation from Chris Larson with SEH, Inc. on the draft City of Ramsey <br />Centralized Water Treatment Facility Study. A link was recently sent via email to SEH's FTP (file transfer) site to <br />allow a copy of the draft study to be downloaded for review prior to the work session. Chris' presentation will touch <br />on the broader topics within the study, along with the primary findings, after which approximately 30 minutes will <br />be reserved for a question and answer session. <br />Timeframe: <br />The presentation and question and answer session will conclude by 7:15 PM. <br />Funding Source: <br />N/A <br />Responsible Party(ies): <br />The City Engineer will introduce the case, after which Chris Larson with SEH will make a formal presentation. <br />Outcome: <br />A hard copy of the study will be distributed to each City Council member at the meeting. <br />No file(s) attached. <br />Attachments <br />Form Review <br />Inbox Reviewed By Date <br />Kurt Ulrich Kurt Ulrich 07/16/2020 04:27 PM <br />Form Started By: Bruce Westby Started On: 06/30/2020 11:28 AM <br />Final Approval Date: 07/16/2020 <br />