Laserfiche WebLink
~i hc proposed Landscaping Plan easily exceeds the minimum planting requirements in City Code. <br />Thc Plan is acceptable with some minor modifications. No tree preservation plan is required as <br />tl-u~, :dtc is void of trees. <br /> <br />'Ibc perimeter of all 3 blocks will have sidewalks or trails that are either interior to the site or a <br />part o1' the Town Center trail system in road right-of-ways. The site plan proposes a system of <br />interior sidewalks that provide pedestrian connections between units and also connections to the <br />'[awn Center trail system. All but 3 of the additional sidewalk connectors recommended in the <br />('itv Staff Review Letter have been incorporated into the Plan. In addition, the Applicants are <br />proposing to install a sidewalk to provide a pedestrian link between the units that front on Bunker <br />Lake Blvd. Because of space restrictions within the boundaries of the plat, they are proposing <br />that the sidewalk be constructed in the right-of-way of Bunker Lake Blvd., parallel to the regional <br />trai~ prolx~sed in that corridor. The Applicants feel that utilizing a private sidewalk, rather than <br />the regional trail, to provide connectivity between the buildings is a safer alternative than direct <br />connection between each unit and the regional trail. The County has verbally indicated a <br />willingness; to work with the Applicant. Ramsey's Engineering Staff is very concerned that such <br />a plan will adversely impact right-of-way needed for future improvements to the BUnker Lake <br />Biwt. c{m-idor. The Applicant's committed to restricting this special concession to this particular <br />development project only; no similar requests will be considered along Bunker Lake Blvd. <br />()vcrctll, the site plan achieves the intent of moving pedestrians within the neighborhoods and to <br />the care arua of Town Center. <br /> <br />Th<: M;tstuu Development Agreement for Town Center establishes that there are no park or trail <br />i'i:es due on this plat. ltowever, there is a park payment obligation in the Master Development <br />/\grcement {hat requires a cash payment, to the City, upon sale of the property in an amount <br />~qu_al Lc> 750 times thc number of eligible units on the property in accordance with the zoning <br /> <br />Thc pr,.:liminary plat is proposing to resubdivide Outlet U, Ramsey Town Center, and part of <br />©utlot lgl Ramsey Town Center 2nd Addition into 33 lots for the 33 multi-family buildings, and <br />iwo autlo~s. After the plat is recorded at the County, the applicants will file CIC (Common <br />interest Community) amendments to the plat as each building is constructed. The CIC acts <br />s~)n~cwI~a,~ like al~ "as built" and locates the building exactly on the lot and identifies the number <br />~i' units i~ tim building. The City has had little experience with CIC's and expressed some <br />c~mcern with the process at the time of sketch plan review. After some additional research, City <br />5taq' i~; corn fortable with the plat as designed into blocks and the follow-up CIC process. <br /> <br />Thc l'hmning Commission conducted the public hearing on May 19, 2005. There were no verbal <br />or wrillen comments submitted as a part of the hearing. The Pl'anning Commission reviewed the <br />,,mtfetanding issues related to a CIC plat design, building architectural features, sidewalk system, <br />driveway lengths, and excessive front yard setbacks. The CIC process was determined to be <br />x::c~qotablc. The modified building elevations-for the Hometown Product and the modified <br />:~iduwaik ~vstem were determined to be acceptable. <br /> <br /> <br />