Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />Pump House Building <br />PROJECT DESCRIPTION <br />Since the time of its construction, Municipal Pump House #3 has been a simple concrete <br />masonry building. As new development occurs around it, Pump House #3's appearance can <br />contribute to the character of surrounding buildings and the proposed plaza by applying <br />new exterior finishes to the existing building. Stone, wood, and metal finishes and colors <br />compliment other civic buildings in Ramsey Downtown District. <br />Note: the sequence of project design and construction will begin with Pump House <br />Building facade improvements, followed by Pump House Plaza site and landscape <br />improvements, and then additional project feasibility evaluation and detailed design <br />related to the Rest Room + Maintenance Building. <br />Preliminary estimate of potential construction cost: $175,000 -190,000 <br />7 <br />The feasibility of adding photo -voltaic array <br />over Pump House #3 and the adjacent <br />plaza, shall be evaluated based upon <br />additional cost estimates and pay -back <br />timeline. <br />