Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />rug <br />nV�N9ip„ IOII�iVui� �DVlul �I <br />Ho lo''NNIVII'llk I d;;I <br />Ii�II���P�M:VI'�hll>!�l�Vd <br />W1,1.1,1111111, <br />Restroom + Maintenance Bldg <br />PROJECT DESCRIPTION <br />'liil"31il�li1 Ndl <br />A proposed Restroom + Maintenance Building will be sided with the same materials as the <br />adjacent Pump House #3.This building will support community activities at Center Street's <br />Municipal Plaza. It will also house equipment for the plaza's irrigation system and for the <br />solar array at the Pump House building. <br />Note: the sequence of project design and construction will begin with Pump House <br />Building facade improvements, followed by Pump House Plaza site and landscape <br />improvements, and then additional project feasibility evaluation and detailed design <br />related to the Rest Room + Maintenance Building. <br />Potential construction cost included in preliminary estimate for the Stormwater <br />Management System described on page 27. <br />11111111111WINI <br />I.iuIN�"'llllllu IllNnm� <br />-IIIVI III "1 <br />3,g3r avast, <br />SAX. M <br />ANNOUNCMEN <br />SCAM <br />;a AND EQUIPIMwrtE',P~'n" k^fC.�CbC�G�"' �' LAN <br />11 <br />