My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 11/12/2020
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2020
>
Agenda - Parks and Recreation Commission - 11/12/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:44:51 AM
Creation date
11/16/2020 1:43:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
11/12/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cipal <br />za <br />Center <br />Street <br />solar <br />canopy <br />plaza <br />lipavement <br />1 stormwater <br />ao catchment <br />9 <br />planter <br />solar <br />canopy <br />Regional <br />Trail <br />vvvvvvvvvVvvVol ovv1VIVIRI <br />uum ol° <br />Center Street <br />access driveway <br />145TH AVENUE <br />Pump House Plaza <br />PROJECT DESCRIPTION <br />Catchment <br />Basin <br />The Conceptual Site Plan for Pump House Plaza includes the following elements: <br />• Paved plaza/sitting area along east facade of the Pump House Building; <br />• Solar canopy/shade structure over the plaza/sitting area; <br />• Paved (10' minimum width) north/south pedestrian walkway; <br />• Stormwater catchment basin/planters between pedestrian walk and Center Street; <br />• Small open lawn/flex space for information/crafts/food tent and other uses; <br />• Variety of landscape plantings to provide shade, color, screening. <br />Note: the sequence of project design and construction will begin with Pump House <br />Building facade improvements, followed by Pump House Plaza site and landscape <br />improvements, and then additional project feasibility evaluation and detailed design <br />related to the Rest Room + Maintenance Building. <br />Preliminary estimate of potential construction cost: $70,000 - 90,000 <br />15 <br />TAREA FRAMEWORK + POLICY PLAN <br />lvvvivvvvvV <br />10' Wide <br />Concrete <br />Wal k <br />Plaza Sitting <br />Area <br />w/Canopy <br />rdt <br />1111111111111 <br />Municipal <br />Pump <br />House #3 <br />The primary objective is to create a series <br />of smaller, pedestrian -scaled public spaces <br />along the east side of Center Street to <br />complement and enhance Municipal Plaza, <br />especially for various events that include <br />the temporary closure of the street. <br />All three of these major elements <br />(Municipal Plaza, Center Street, east <br />frontage public spaces) will seamlessly fit <br />together, including consistent materials, <br />finishes and furnishings to create a unique <br />identity and inviting destination crossroads <br />in the heart of the COR District. <br />
The URL can be used to link to this page
Your browser does not support the video tag.