My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 11/12/2020
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2020
>
Agenda - Parks and Recreation Commission - 11/12/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 11:44:51 AM
Creation date
11/16/2020 1:43:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
11/12/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />Replace, existing <br />Ma w <br />gutter, storm- <br />er catchment <br />asins and other <br />proposed improve- <br />ments in this area, <br />Keep existing fb/ <br />gutter, concrete <br />walk/Regional Trail <br />and street pave- <br />ment in this area. <br />Regional <br />Trail <br />Stormwater Catchment <br />Basin (both sides) <br />Parallel <br />Parking Bay (both <br />sid <br />10' Wide <br />muuuuuuuuuuu111r uuuuuuuu11,11 uuuuuuuuut111ruuuuuuuuuu11,11 uuuuuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuu 4111uuuuuuuuuuuuu <br />Center Street <br />PROJECT DESCRIPTION <br />The primary purpose of the Conceptual Site Plan for Center Street is to illustrate how this key <br />north/south connector ties together all the other pieces of this Framework + Policy Plan. <br />At the same time, it also promotes various opportunities for innovative district infrastructure <br />as an integral part of current and proposed street, park, trail and private development <br />project design - suggesting shared systems for stormwater capture/reuse, energy <br />production/distribution, waste handling/recycling and other technologies. <br />Potential construction cost to be determined as part of other Center Street projects. <br />It's important to note however, that this <br />document also presents a somewhat <br />cautious approach, seeking to minimize <br />disruption to existing Center Street <br />improvements.The basic objective is to work <br />with existing curb lines, parking bays and <br />other pavement dimensions as the starting <br />point for completing street construction to <br />Ramsey Parkway and northward to Bunker <br />Lake Boulevard. (Also refer to the Sapphire <br />Apartments Frontage and Central Anoka <br />County Regional Trail information in this Plan) <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.