Laserfiche WebLink
Trail ' Corridor Descriptions <br />and Cost Estimates <br /> <br />wittfin the City of Ramsey, <br />there are 10 primary trail <br />corridors. The shorter, <br />miscellaneous trail segments have <br />been lumped into one category. <br />While these segments are not. <br />associated with a named, primary <br />corridor, thcy constitute the greatest <br />sum of proposed trail Construction. <br /> <br />l~.'~ach of the trail corridors are <br />some[tries made up of differenti <br />trail types, in varied segments. In <br />other cases, the trail type may <br />more homogenous. Since the <br />Ramsey Master Trail Plan focuses <br />on general alignment and does not <br />identify specific trail types for all <br />instances, some general <br />assumptions ~vere made about what~ <br />trail types would be used given the <br />anticipated terrain. Trails that do <br />not cross wetlands were simply! <br />categorized as "upland," <br /> <br />In wetland areas, three different ave[land types were identified and categorized <br />as type A, B, & C. Each of these three different types have physical <br />characteristics that are unique and require different crossing techniques. The <br />estimated costs belo~v are broken down further in this section, along with a <br />brief trail corridor description. See Section 6 for different wetland crossing <br />details. <br /> <br />The 10 Primary Trail Corridors in City of Ramsey (miscellaneous trails <br />are grouped in #11) and the estimated costs. <br /> <br />1. Trott Brook Trail $1,817,851 <br />2. Lake Itasca Trail $254,470 <br />3. Elmcrest to Central Park Trail $820,723 <br />4. N[ississippi River Trail $554,189 <br />5. Alpine Drive Tr,qJl $71,808 <br />6. Greenland Hills Trail $396,079 <br />7. Savanna and Cottomvood Trail $117,704 <br />8. Bunker Lake Boulevard Trail $541,847 <br />9. Sumvood Drive Trail $656,621 <br />10. Trunk Highxvay #47 Trail $509,256 <br />11. Miscellaneous Trail Corridor Descriptions $9,085,718 <br /> <br />Total Cost Estimate for proposed trails <br />Note: All cost estimates are based on 2003 unit prices <br /> <br />$14,826,266 <br /> <br />Note <br />For trail distance information please see Figure XX <br />For enlarged aerial map trail descriptions please see Figures <br /> <br />Summary Estimate of Ail Proposed Trail Corridor Improvements in <br />the City of <br /> <br />CAPITAL COSTS: <br />Trail Development Cost: <br /> <br />TOTAL CAPITAL COST <br /> <br />TOTAL COST: $14,826,266 <br />(Note: All costs are tr 2003 estimates.) <br /> <br />$14,826,266 <br />$14,826,266 <br /> <br /> <br />