My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2005
>
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 3:09:04 PM
Creation date
6/7/2005 8:12:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Title
Joint with CC
Document Date
06/09/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail'Corridor Descriptions <br />and Cost Estimates <br /> <br /> Mississippi River Trail <br />TSi~; proposed trail follows the southern boundary of the City. On the <br />s(',ttthwestem edge of' the City the trail is a multi-purpose tr,-til which heads <br />~o,~, ttxe Sherburne/Anoka County line then north until County Road <br />I t~. Thc tt:ail then heads east parallel with County Road # l0 while <br />tra~slYrming into an on-road type of trail. When the trail is beyond Bowers <br />1)~:iv-c N\V, ii heads south and traverses through undeveloped land. The trail <br />,,t, ir~d: ea:;~ ~mtJl 142"" Avenue N'~X/[ The trail remains an on-road type of trail <br />ri] it re:tc[~c:; the Mississippi West Regional Park and switches to an off-road <br />trail. 'l'lxe t'rail is on the south part of the park and connects with 37'h Avenue <br />\%:s~: :md becomes an on-road type of trail. The trail heads east and then north <br />cn it in tcrsccts xvith Dolomite Street NA,V then east again at Riverdale Drive <br />?,i\~,i \t Tut]gsten Street NW the trail briefly heads south then east again at <br />Ri~.'iw~ Avctmc NW. The trail then ends at the City's border. The trail would <br />,,:r,~sisr oi: multi-purpose, on-road, and off-road tra, il descriptions and road <br /> <br />Estimated Trail Length: 6.56 miles long <br />Cost Estimate: $554,189 <br />Trail cost summary: <br />Upland cost: 6.56 miles x $16/LF = $554,189 <br />Wetland costs: not applied <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.