My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2005
>
Agenda - Parks and Recreation Commission - 06/09/2005 - Joint with CC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2025 3:09:04 PM
Creation date
6/7/2005 8:12:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Title
Joint with CC
Document Date
06/09/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trail 'Corridor Descriptions <br />and Cost Estimates <br /> <br />'L Savanna and Cottonwood Trail <br />r}7['i~; t~:ail iN am e.'ds ting north-south trail that links Cottonxvood Trail to'Petzer <br />1):nq~. The ;r:til is l()cated h~ the southern central part of the Ci~. The trail <br />(~,.)nsists ,)~' (m-road trail sections and road crossings. This trail segment is <br />~!,pro:dm~ttcly 0.43 miles long. <br /> <br />Estimated Trail Length: 0.43 miles long <br />Cost Estimate: $117,704 <br />Trail cost summary: <br />I ipland cost: 0.28 miles x $16/LF = $23,654 <br />Wetland costs: <br />Wetland A = 75% wet soils <br />Wetland B = 20% sat. soils <br />Wetland C - 5% floating <br />Wedand crossing length = 0.66 miles <br />(A): 0.1125 miles x $96/LF = $57,024 <br />(B): 0.03 miles x $140/LF = $22,176 <br />((~): 0.0075 miles x $375/LF = $14,850 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.