My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/17/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 11/17/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:55 AM
Creation date
12/1/2020 9:27:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sunfish Lake Boulevard/CSAH 57 & Alpine Drive, and to Nowthen Boulevard/CSAH 5 & Alpine Drive. Since <br />Alpine Drive is a City Street the City would be responsible for all costs associated with installing any FYA <br />improvements at these intersections. <br />Construction could easily occur in 2021 if SEH, Inc. is directed to start their analysis efforts in December 2020 and <br />required future approvals are granted in a timely manner. <br />Timeframe: <br />Approximately 25 minutes for presentation and discussion. <br />Observations/Alternatives: <br />Observations: <br />The final construction cost for the FYA modifications to the signal system at Armstrong Boulevard & Sunwood <br />Drive/147th Avenue was $29,760. The estimated average cost to modify an existing signal system to include FYA <br />operations is $20,000 to $50,000. <br />Plans and specifications would be required to advertise for bids for construction of any FYA modifications, which <br />would require separate approvals. Costs to prepare plans and specifications for the FYA improvements at <br />Armstrong Boulevard & Sunwood Drive/147th Avenue were around $6,500. <br />It should be noted that traffic volumes and patterns are likely to change after the grade separation improvements <br />occur at CSAH 56/Ramsey Boulevard & Highway 10, after CSAH 116/Bunker Lake Boulevard is reconstructed <br />between CSAH 83/Armstrong Boulevard and CSAH 57/Sunfish Lake Boulevard, and after a signal system is <br />installed at CSAH 116/Bunker Lake Boulevard and Sunwood Drive. All of these are likely to have some impact on <br />FYA operations at Sunwood Drive & CSAH 56/Ramsey Boulevard, which could result in a future Anoka County <br />request to remove or modify FYA improvements. This should be confirmed as part of the analysis. <br />Alternatives: <br />Alternative #1 — Motion to recommend City Council authorization to hire SEH, Inc. to analyze the feasibility of <br />modifying signal systems to add flashing yellow arrow operations at the intersection(s) of <br />Alternative #2 — Motion of other. <br />Funding Source: <br />The estimated cost for analyzing the feasibility of adding FYA operations to one signal system is $1,800 if the City <br />provides traffic counts, and $3,500 if SEH needs to provide traffic counts. If multiple intersections are analyzed, the <br />cost per signal system would be reduced accordingly. For example, if 6 signal systems are analyzed the estimated <br />cost per signal system would be closer to $1,300. <br />The Public Improvement Revolving Fund would be the funding source for any such analysis. <br />Recommendation: <br />Staff supports either alternative. <br />Action: <br />Recommend City Council authorization to hire SEH, Inc. to analyze the feasibility of modifying signal systems to <br />add flashing yellow arrow operations at the intersection(s) of <br />Attachments <br />2017 FYA Analysis <br />
The URL can be used to link to this page
Your browser does not support the video tag.