My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/17/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 11/17/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:55 AM
Creation date
12/1/2020 9:27:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimated Costs and Quantities <br />Revise Signal System (FYAModifications) <br />C8AH 83 cdSunvvood Drive/147thAvenue NW <br />Prepared byJyWG(SEH)onMarch 21.2017 <br />Item <br />Quantity Unit Cost Total Cost <br />Estimated Estimated Estimated <br />Remove 3-SectonSignals 8 $300 $2'400 <br />4-SeuUonSignals (with LED) Q $900 $8'100 <br />5-Foot Extension 1 $2.500 $2.500 <br />Strap -on Mid Mast Arm Mount 1 $1.000 $1,000 <br />R10-K12Sign Panels 4 $500 $2'000 <br />Controller Cabinet Modifications 1 $2.000 $2,000 <br />8xGNIVICLoop Detectors 8 $1.500 $12'000 <br />6/o#14 Cable (to poles 1. 2, 3' 4> 800' $2 $1.800 <br />EVPdetector modifications 1 $500 $500 <br />Traffic Control 1 $2'500 $2.500 <br />Sub Total $34,600 <br />Miscellaneous approx. 15% $5,400 <br />Total Estimated Revise Signal System Costs $40.000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.