My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 11/17/2020
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2020
>
Agenda - Public Works Committee - 11/17/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:29:55 AM
Creation date
12/1/2020 9:27:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
11/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 1. <br />Meeting Date: 11/17/2020 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Receive Staff Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />rpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• The COR Regional Infiltration Basin (#18-09) <br />• Final payment anticipated December 2020 <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Requested by DNR <br />• Construction proposed 2021 <br />• Variolite Street Reconstruction (#20-01) <br />• Sanitary sewer and watermain construction complete <br />• Base course paving complete <br />• Wear course paving weather dependent <br />• Centerline striping will be provided in 2020 <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Construction proposed for 2022, pending City and County approvals <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Constructing additional turn lanes to improve congestion and safety in 2021 <br />• Staff will review the final design layout with the PWC during the meeting <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 - 2024 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />• Preliminary design is still on hold <br />• MnDOT exploring realignment of Highway 47 to remove S-curve, which would require the relocation <br />of Alter Recycling <br />• Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 - 2024 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• Anoka Solution Highway 10 Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.