My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 12/03/2020
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2020
>
Agenda - Planning Commission - 12/03/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 11:06:39 AM
Creation date
12/2/2020 12:51:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
12/03/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maximum Lot Coverage (All 35% N/A. Appears it will meet <br />Buildings, Excludes Paving) requirement. <br />Maximum Driveway Width at Street 30 feet Not noted but should meet <br />24 on cul-de-sac requirement. <br />Driveway Surface Bituminous or Concrete Bituminous or Concrete <br />Minimum Driveway Length 25 feet 25 feet <br />Wetland Setback 16.5 feet Not noted but should meet <br />requirement. <br /> <br />Wetlands/Floodplain: There are significant wetlands onsite, which will require a wetland delineation <br />with 16.5 foot buffer on any edge of a wetland encumbered by drainage and utility easement. <br />Streets and Access: <br />- Concept 1 (9 Lots) this proposal includes a long cul-de-sac that would require a variance <br />- Concept 2 (19 Lots) this proposal also includes a long cul-de-sac technically, but has a loop at <br />the end of the road instead of ending in a typical cul-de-sac. Public safety prefers this option to <br />allow for easier turnaround at the end. This proposal also provides the opportunity to connect the <br />road to the properties to the west and east, which is preferred by public safety. <br />Well and Septic: With the preliminary plat, the developer should show the proposed house pads and a <br />primary and secondary location for the septic to ensure the lots are adequately sized. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.