Laserfiche WebLink
Bqqmjdbou!Sftqpotf <br />Vqebufe!Cz <br />Joe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe Feriancek <br />PMPMPMPMPMPM <br />Nbslvq!Ebuf <br />11/03/2020 2:53 11/03/2020 2:53 11/03/2020 2:53 11/03/2020 2:53 11/03/2020 2:53 11/03/2020 2:53 <br />Dibohfnbsl!Efubjmt <br />NOT MUCH BUILDABLE AREA ACCESSABLE LOTS 3-5. THIS WILL REQUIRE GRADING AND WETLAND DELINEATION.DIMENSION ARROW IS AT THE ROW, WHEN IT SHOULD BE AT THE EDGE OF PAVEMENT.CDS IS NEARLY <br /> 3 TIMES THE MAX 600' CDS LENGTH.WOULD WE REQUIRE THIS CONNECTION TO BE MADE AT THE TIME OF DEVELOPMENT? EASIEST ROUTE TO A 2ND EXIT FOR THESE HOMES.HOW MUCH BUILDABLE IS AVAILABLE WITH <br /> POWER LINE EASEMENT THROUGH MIDDLE OF LOT? THIS WILL HAVE AN IMPACT ON FUTURE USAGE FOR SECONDARY BUILDING, ETC.HOW LIKELY IS THE CONNECTION TO THE EAST? COULD SPACE FOR A CDS BE MADE <br /> TO KEEP ACCESS FOR LOT 17? <br />Dibohfnbsl!Tvckfdu <br />ACCESS LOTS 3-5CDS DIMENSIONCDS LENGTHCAROL-ROSESUBDIVISIONCONNECTIONLOT 13STUB TO EAST <br />Nbslvq!Obnf <br />JJFJJFJJFJJFJJFJJF <br />Gjmf <br />2020-10-26 Bacon Concepts.pdf2020-10-26 Bacon Concepts.pdf2020-10-26 Bacon Concepts.pdf2020-10-26 Bacon Concepts.pdf2020-10-26 Bacon Concepts.pdf2020-10-26 Bacon Concepts.pdf <br />Tobqtipu <br />Efqbsunfou <br />Civil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer II <br />Tubuvt <br />UnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolved <br />Dpnqmfuf@ <br />FalseFalseFalseFalseFalseFalse <br />123456 <br />Sfg!$ <br />Dzdmf <br />1 <br />Hspvqjoh <br />Dibohfnbslt!Sfqpsu! <br />Main Workflow <br /> <br />