Laserfiche WebLink
BASIS OF PAYMENT: <br />Mobilization — Payment shall be made on a lump sum basis for the mobilization of equipment. <br />Traffic Control — Payment shall be made on a lump sum basis as compensation for all equipment, <br />material, and labor costs required for the installation and maintenance of traffic control measures <br />(signage, barricades, flashers, flaggers, etc.), as directed by the Engineer, for any local traffic <br />disruptions or temporary closures. <br />Televising Sewer — Payment shall be made on a per lineal foot basis. The cost shall include <br />description, and video of the sewer lines. <br />Other Items — The cost of any additional equipment, labor, materials, tools and supplies which <br />have not been specifically identified in this section for payment, but are required to complete the <br />project per the plans and specifications shall be considered incidental to the project. <br />4 <br />