Laserfiche WebLink
M <br />N <br />Capital Improvement Program <br />City of Ramsey, Minnesota <br />0 <br />E <br />N <br />H <br />19-SEW-002 <br />Useful Life <br />Sewer Utility Improvement <br />1-Existing Obligation (High) <br />Total Cost <br />0 <br />• <br />• <br />CA <br />a) <br />0 <br />0 <br />r/1 <br />0 <br />0 <br />• <br />O <br />N <br />0 <br />. <br />0 <br />O <br />U <br />-60 <br />Justification <br />By 2021, both pumps will need to be replaced to assure proper pumping and rel: <br />Replace both pumps and base elbows due to normal wear. <br />O <br />H <br />00 <br />N <br />N <br />Expenditures <br />0 <br />O <br />H <br />Cfl <br />N <br />N <br />00 <br />N <br />N <br />N <br />N <br />O <br />N <br />N <br />O <br />N <br />N <br />N <br />N <br />N <br />Funding Sources <br />0 <br />0- <br />Sewer Utility Fund <br />O <br />H <br />