Laserfiche WebLink
Gamehaven Wetland Mitigation Bank <br />SEH prepared a Wetland Bank Plan and Mitigation Banking Instrument which <br />proposes the restoration of approximately 200 acres of drained farmland into <br />wetland and upland native vegetation. Pre -project preparations i cluded <br />hydrology monitoringwetland delineations, soil investigations, -nd <br />coordination of herbicide applications and prescribed burns to crntrol invasive <br />species. The bank plan required multiple years of data gatherin.. A major <br />concern of the restoration is the extent of invasive species present. which is <br />proposed to be moderated through completion of a soils inversi.n as part of <br />the grading plan This management practice is an innovative sol tion to <br />invasive species by burying the weed seeds. and at the same ti e exposes <br />the historic seedbank to the surface <br />Reference: Matt Crawford, City of Rochester <br />email: mcrawford@rochestermn.gov. Phone: (507) 328-241 <br />The City of Maplewoo <br />services for a regional treatm <br />the overall planning and des <br />Anoka County Wetland Delineations <br />SEH staff have a long history of completing wetland delineation <br />County, which has a unique challenge due to the dominance of t <br />the associated groundwater fluctuations present Since 2000, S <br />hundreds of wetland delineation for Anoka County. and the multi <br />Additional Wetland Mitigation Banks <br />SEH has worked with both public entities and private landowner <br />some of our additional site work is included for reference. On ea <br />kev tacks which are outlined below. <br />Lake Superior Wetland Bank (Sax-Zim, MN) <br />i. ritical Tasks under the responsibility of SEH Wetlan <br />Plan Vegetation Survey. Tree survey Annual Monitori <br />Critical Tasks under the responsibility of SEH Wetlan+ <br />Approval of Plan. Construction Oversight, Vegetation Survey <br />IIHaywire Point Wetland Bank (Palisade, MN) <br />Critical Tasks under the responsibility of SEH Wetlanc <br />Plan, Vegetation Survey. Annual Monitoring Report. In <br />Critical Tasks under the responsibility of SEH <br />Vegetation Survey Annual Monitoring <br />Maplewood Mogren Wetland Mitigation Site <br />hired SEH to provide design, planning and construction oversight <br />nt pond and a multi -cell wetland mitigation area SEH coordinated <br />gn of the stormwater and wetland systems for the Maplewood Mall <br />Area Transportation Improvements (MMATI) project <br />nd mitigation within Anoka <br />e Anoka Sand Plain and <br />H staff have completed <br />le cities and townships <br />to develop and implement many mitigation plans A short list of <br />h of these project. SEH assisted project proposers with several <br />mitigation planning documents, Site Design. Agency Approval of <br />g Report, Invasive Species Control <br />Deer River Wetland Bank (Itasca Co., MN) <br />mitigation planning documents Site Design, Agency <br />Annual Monitoring Report, Invasive Species Control <br />• <br />mitigation planning documents. Site Design, Agency Approval of <br />asive Species Control <br />Hardrives Wetland Bank (St. Cloud, MN) <br />Wetland mitigation planning documents. Site Design. <br />eport, Invasive Species Control. Credit Administration <br />Bluff Creek Wetland Mitigation Bank (Douglas Co., Wt) <br />Critical Masks under the responsibility of SEH . Wetland <br />Survey Annual Monitoring Report. Invasive species cor <br />delineation, Site Design, Agency Approval of Plan. Vegetation <br />trot, Threatened and Endangered Plant Survey <br />SHORT ELLIOTT HENDRICKSON INC 5 <br />