Laserfiche WebLink
a <br />2021 Proposed <br />2020 Adopted <br />0 <br />O <br />0 <br />• <br />N <br />o <br />0 <br />O <br />WI <br />100 + Assessment Agreement <br />80.00/hr./minimum 2 hr. <br />Equal to Permit Fee <br />O <br />o <br />0 <br />O <br />00 <br />0 <br />0 <br />N <br />N <br />0 <br />0 <br />O <br />V1 <br />0 <br />0 <br />O <br />.1 <br />0 <br />0 <br />O <br />O <br />0 <br />H <br />0 <br />N <br />50% of Comm Mech Permit fee (None - <br />Refundable) <br />0 <br />0 <br />O <br />Vi <br />0 <br />0 <br />O <br />V1 <br />0 <br />0 <br />O <br />N <br />0 <br />0 <br />O <br />V1 <br />100.00 <br />0 <br />0 <br />O <br />O <br />0 <br />VOi <br />N <br />0 <br />0 <br />Min $500.00/Max $1,500.00 <br />80.00 per trip <br />0 <br />0 <br />N <br />r <br />City of Ramsey Valuation Fee Schedule <br />0 <br />0 <br />I�) <br />0 <br />0 <br />N <br />0 <br />0 <br />y; <br />- <br />250.00 <br />0 <br />0 <br />V; <br />- <br />2,485.00 <br />0 <br />0 <br />- <br />25.00 <br />2% of Job Value/Minimum 258.00 <br />50.00 <br />1.00 <br />100.00 <br />50.00 <br />0 <br />0 <br />O <br />Vi <br />SPECIAL NOTES <br />Less than 7 feet in height <br />Cover 2 trips <br />1.5 times hourly rate <br />Work Started Without a Permit <br />Cover 1 trip <br />New Construction <br />Remodel/Addition <br />New Construction <br />Remodel/Addition <br />L <br />o o <br />N <br />New Construction <br />Remodel/Addition <br />New Construction <br />Remodel/Addition <br />Cover 2 trips <br />Cover 2 trips <br />City Required pre -inspection <br />[current MCES rates] <br />Applies to all permit types <br />Per State of Minnesota Fee Schedule <br />y' <br />o <br />x <br />N <br />'y <br />SERVICE OR LICENSE <br />Fence Permit <br />Fireplace Permit <br />Furnace Replacement <br />Home Improvement Erosion Control Escrow <br />Inspections -After Hours/Weekend <br />Investigation Fee <br />Gas Line (Residential) <br />Landscape Escrow <br />Lawn Irrigation -Residential <br />Lawn Irrigation -Commercial (Multi) <br />Mechanical Permit -Residential <br />Mechanical permit -Commercial <br />Plan Check fee (65% of commercial mechanical <br />permit) <br />Moving Structure Permit <br />Moving Structure Permit Site Inspection <br />Mobile Home Tie Down <br />Mobile Home Water Hookup <br />Plumbing permit- Residential/Single Family <br />Plumbing permit- Commercial <br />Public Sidewalk Panels -Broken <br />Refnspection Fees <br />Re-Roofing/Shingling Permit -Residential <br />Re-Roofing/Shingling Permit-Commercial/Multi-Family <br />Re -Siding Permit <br />Replacement Windows (Residential) <br />Septic system permit -residential <br />Septic system permit -commercial <br />Septic Tank Installation Permit -Residential <br />Service Availability Charge (SAC) <br />Septic Tank Pumping Permit <br />Sewer permit (Utility Connection) -Residential <br />Sewer permit (Utility Connection) -Commercial <br />Site Evaluation Fee <br />State Surcharge <br />Swimming pool permit <br />Vacuum Breaker Verification for Irrigation System (RPZ)-Residential <br />Vacuum Breaker Verification for Irrigation System (RPZ)-Commercial <br />