Laserfiche WebLink
2. Knowledge and experience of key project personnel in the administration of the Wet Land <br />Conservation Act. (30%) <br />3. Clear and concise work plan that demonstrates an understanding of the project. The project <br />scheduled shall be such that implementation might be initiated as early as possible in 2021. <br />(40%) <br />4. Cost (15%) <br />VII Attachments <br />The attachments are included in this dropbox link <br />https://www.dropbox.com/sh/0glvrkixbka0lnt/AACU1zG_nVUGXZX95vn6e6rQa?d1=0 which <br />includes seven (7) documents which provide background on the RTC wetland mitigation/ <br />replacement. These attachments include: the LRRWMO permit approval letter; the RTC AUAR <br />document (chapter 12), Plans for the Overall Mitigation Plan, the NW Wetland grading, the Pact <br />Wetland Grading, the 2011 monitoring report and the 2012 monitoring report. <br />The attachments also include COR replacement wetlands — LRRWMO letter 7-6-20 which <br />outlines the steps necessary to certify to the LRRWMO that the wetlands are functioning <br />properly so that the LRRWMO project can be closed out. <br />3 <br />