My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/24/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 11/24/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:10:32 PM
Creation date
12/9/2020 10:04:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/24/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Standard Rates <br />61 HOUSTON <br />engineering, inc. <br />2021 FEE SCHEDULE <br />The following is a schedule of hourly rates and charges for engineering and surveying services offered by <br />Houston Engineering, Inc. These rates are subject to a modest increase on January 1st of each year (typically no <br />more than 5%). <br />Cate ___. ,I <br />1 Rees" <br />Engineer I <br />$129 <br />Engineer II <br />142 <br />Engineer III <br />161 <br />Project Engineer <br />179 <br />Project Manager <br />196 <br />Sr Project Manager <br />215 <br />Scientist I <br />$129 <br />Scientist II <br />142 <br />Scientist III <br />162 <br />Project Mgr — Environmental <br />190 <br />Sr Project Mgr— Environmental <br />215 <br />Hydrogeologist I <br />$129 <br />Hydrogeologist II <br />143 <br />Hydrogeologist III <br />162 <br />Sr Hydrogeologist <br />202 <br />Construction Engineer <br />$148 <br />Sr Construction Engineer <br />175 <br />Land Surveyor I <br />$129 <br />Land Surveyor II <br />148 <br />Land Surveyor III <br />163 <br />Project Mgr — Land Surveying <br />175 <br />Sr Project Manager— Land Surveying <br />196 <br />Survey Crews: <br />1-Person Crew (+ equipment) <br />$157 <br />2-Person Crew (+ equipment) <br />191 <br />3-Person Crew (+ equipment) <br />237 <br />4-Person Crew (+ equipment) <br />265 <br />Landscape Architect <br />$137 <br />CAD Technician I <br />$88 <br />CAD Technician II <br />101 <br />CAD Supervisor <br />116 <br />Designer I <br />$135 <br />Designer II <br />145 <br />Sr Designer <br />156 <br />Engineering Specialist <br />165 <br />Technician Intern (all areas) <br />$88 <br />Technician I <br />$101 <br />Technician II <br />116 <br />Sr Technician <br />129 <br />Standard <br />:114o`. -7 - - _ _ _ - __ �f''2l <br />Ram <br />Right -of -Way Technician <br />$118 <br />Right -of -Way Specialist <br />196 <br />GIS Analyst I <br />$96 <br />GIS Analyst II <br />112 <br />GIS Analyst III <br />129 <br />Sr GIS Analyst <br />148 <br />Project Manager— GIS <br />163 <br />Sr Project Manager— GIS <br />190 <br />Software Engineer I <br />$112 <br />Software Engineer II <br />129 <br />Software Engineer III <br />148 <br />Sr Software Engineer <br />162 <br />Computer Technician <br />$156 <br />Communications Specialist <br />$88 <br />Sr Communications Specialist <br />98 <br />Administrative Assistant <br />$83 <br />Sr Administrative Assistant <br />88 <br />Planner <br />$142 <br />Senior Planner <br />196 <br />Legislative/Grant Specialist <br />$182 <br />Expert Witness <br />236 <br />Drone Pilot <br />$137 <br />Drone Visual Observer <br />54 <br />Chargeable Expenses <br />Subsistence <br />Rate <br />Actual Cost <br />Mileage -Vehicles: <br />2-Wheel Drive <br />4-Wheel Drive <br />IRS Standard Rate <br />IRS Standard Rate + <br />$0.20/Mile <br />GPS Equipment <br />$25/hour/unit <br />Robotic Total Station <br />$40/hour <br />ATV/Snowmobile/Boat <br />$15/hour <br />ATV with Tracks <br />$30/hour <br />Hydrone RCV <br />$50/hour <br />Small UAS/Large UAS <br />$25/hour / $50/hour <br />Delivery, Postage, <br />Printing <br />Actual Cost <br />Surveying Materials, <br />Special Equipment, and <br />other Materials required <br />Actual Cost <br />Subconsultants <br />Actual Cost + 10% <br />HEI PROPOSAL <br />OCTOBER 12, 2020 <br />CITY OF RAMSEV <br />REVIEW AND MONITORING OF WETLAND MITIGATION AREAS IN THE COR <br />
The URL can be used to link to this page
Your browser does not support the video tag.