My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/14/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 06/14/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:51:00 PM
Creation date
6/10/2005 2:31:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/14/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preli~ninary Plat and Site Plan Review <br />Shade Tree Cottages <br />April 1, 2005, revised May 6, 2005 <br />Page 5 of 6 <br /> <br />17. Ground Cover/Irrigation. City Code requires all areas otherwise not improved to be established with sod. <br /> Staff is assuming that the development will comply with this requirement. An irrigation system will need to be <br /> provided throughout the development where sodded and landscaped areas are established. The proposed <br /> irrigation system will need to be reviewed by the City Engineer. The irrigation system will need a dedicated <br /> service(s) that must be shown on the utility plan. <br /> <br />Sidewalks. A sidewalk is being proposed along Quicksilver Circle which is desireable. <br /> <br />19. Trail Development. The city requires construction of trails adjacent to state, county and MSA routes. Nowthen <br /> boulevard is a county highway. A trail is being shown along Nowthen boulevard. The.requirement is to place <br /> the edge of the pavement 2 feet away from the property line. The trail must be extended to the nearest streets, <br /> 157'~ Lane north of the site and the northern extension of Old Nowthen Boulevard South of the site. Detailed <br /> plans tbr the trail construction are required as part of final plat submittal. In accordance with the Park and <br /> Recreations recommendation a trail connection has been made from Quicksilver Circle to County Road #5. <br /> <br />The current trail development fees are $550 per unit, the fees for this development will be $23,100. The <br />portion of the trail constructed outside the plat is can be used for credit against the trail development fees <br />required t'br the plat. <br /> <br />A looped trail is shown in the southwest comer of the site adjacent to Nowthen Boulvard. The trail shown <br />exceeds the maximum slope in several locations.- Additional detail on this trail must be supplied. <br /> <br />20. Park Dedication. The Park and Recreation Commission met on April 14th and recommended park <br /> dedication be satisfied through a cash payment. The 2005 fee schedule is $2200/unit for Park dedication, <br /> which equates to $92,400 ($2200x 42). <br /> <br />21. Sanitary Sewer and Water Trunk Fees: The city has established a sanitary sewer and water trunk fee that <br /> must be paid prior to release of the final plat for recording. Since the existing properties were not hooked up <br /> to City Sewer and Water, all 42 lots will need to pay the Sewer and Water Trunk Fees. The 2005 Rate is <br /> $2962 per lot. The total amount due is $124,404 ($2962 x 42 lots). This amount must be paid prior to the <br /> release of the final plat for recording. <br /> <br />22. Stormwater Management Fee: A storm water management fee of $375.per lot must be paid for all new <br /> lots created. The total amount due is $15,750 ($375 x 42 lots) and must be paid prior to release of the final <br /> plat. <br /> <br />,23. Other Permits. The applicant is responsible for any other permits required by other regulatory agencies. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.