Laserfiche WebLink
parts ~and components become tke property of <br /> the State. Upon removal of tke EVP System, <br /> (System "D"), pursuant to this paragraph, <br /> all of its par~s and' components become the <br /> property of Ramsey. <br /> e) Ail timing of the EVP Systems (Systems "A", <br /> <br /> "B", "C", and "D") will be determined by the <br /> State. <br /> <br /> 11. Final plans and specifications for construction <br />of the traffic control signal work provided in Paragraph 3 will <br />have County approval prior to award of construction contract by <br />the State. Said County approval will be evidenced by signature <br />of the County Engineer in the designated space therefore on the <br />original plan. <br /> <br /> 12. All timing of the new and revised Traffic-Control <br />Signals (Systems "A", "B", "C", and "D") will be determined by <br />5he S~ate, and no .changes may be made 'except with the approval <br />of ~he Sta~e. <br /> <br /> 13. Each party will be solely responsible for its own <br />acts and omissions, and the results thereof, to the extent <br />authorized by law. The StaTe's liability is governed by the <br />Minnesota Tort Claims Act, Minnesota Statutes Section 3.736 and <br />the County's, Anoka's, and Ramsey's liability is governed by <br /> <br />Minnesota StatUtes Chapter 466. <br /> <br />Each party will be solely <br /> <br />87957R <br /> <br /> <br />