Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />Affinity <br />Apartments <br />Central Anoka <br />County Regional <br />Trail <br />10' concrete walk <br />Stormwater catchment basins <br />Parallel parking bay <br />n <br />SOLAR CANOPY <br />MAINTENANCE ACCESS (12') <br />Future Pump House Plaza + <br />Pump House Building <br />Facade Improvements <br />Sappphire Apartment Frontage <br />PROJECT DESCRIPTION <br />The Concept Site Plan for the Sapphire Apartment Frontage along the east side of Center <br />Street includes three primary elements: <br />• A 10' wide concrete walk; <br />• Stormwater catchment basins; <br />• Parallel parking bay. <br />Preliminary estimate of potential construction cost: $65,000 - 80,000 <br />The Sapphire Apartment Frontage will be the <br />first segment of public(pedestrian) realm to <br />be completed, and as such plays an <br />important role in establishing these elements <br />as the benchmark for future projects along the <br />east side of Center Street. A gracious walkway <br />width (10'), connected stormwater basins, and <br />landscape plantings that complement existing <br />streetscape,will not only further enhance the <br />desired Downtown District street character, but <br />also set design expectations for Pump House <br />Plaza and the now -vacant development site at <br />Sunwood Drive. <br />19 <br />