Laserfiche WebLink
CENTER STREET AREA FRAMEWORK + POLICY PLAN <br />Future <br />Municipal Plaza <br />Central Anoka <br />County Regional <br />Trail <br />Existing <br />parallel <br />parking bay <br />10' concrete <br />walk <br />Stormwater <br />catchment <br />basins <br />Future <br />Private Plaza <br />for Public Use <br />Future Development Site Frontage <br />PROJECT DESCRIPTION <br />The Concept Site Plan for the Future Development Site Frontage along the east side of <br />Center Street matches recommendations for Sapphire Apartment Frontage and Pump <br />House Plaza to the north, including three primary elements: <br />• A 10' wide concrete walk; <br />• Stormwater catchment basins; <br />• Parallel parking bay. <br />Preliminary estimate of potential construction cost: $80,000 -100,000 <br />Following in the footsteps of the Sapphire <br />Apartment project, future development <br />of this site will also include a gracious <br />pedestrian walkway (10' width), connected <br />stormwater basins, and landscape plantings <br />that complement existing streetscape, <br />further enhancing the desired Downtown <br />District street character as a welcoming local <br />and regional destination. <br />31 <br />