My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 01/19/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 01/19/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:31:58 AM
Creation date
1/15/2021 3:43:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
01/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Construction proposed 2022, pending City & County approvals <br />• CSAH 116 Corridor Improvements <br />• Construction tentatively proposed 2021, pending City & County approvals <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Constructing additional turn lanes to improve congestion and safety in 2021 <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 - 2024 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design is still on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve, which would require the relocation <br />of Alter Recycling <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 - 2024 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• Anoka Solution Highway 10 Improvements <br />• Construction proposed 2022 - 2024 <br />• NW Metro Surface Water Supply Feasibility Study <br />• Member cities include Corcoran, Dayton, Ramsey and Rogers <br />• MCES funded 100% using Clean Water Funds <br />• Draft study complete e Findings to be presented at future meeting <br />• City of Ramsey Centralized Water Treatment Facility Study <br />• Feasibility Study to be reviewed at February PWC meeting <br />• Ramsey Gateway Highway 10 Improvements <br />• Design efforts underway for Ramsey Blvd. and Sunfish Lake Blvd. <br />• Approximately half of the $138 estimated project costs are secured <br />• Remaining funding continues to be pursued <br />• NW Metro Mississippi River Crossing Feasibility Analysis <br />• No updates at this time <br />• TH 47 Safety Study <br />• No updates at this time <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Monitoring discussions in Minneapolis and Saint Paul <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />Recommendation: <br />NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.