Laserfiche WebLink
Ramsey Tiger Street Infrastructure Replacement December 11, 2020 <br />Project #: 17623.20. M NS Page - 3 <br />in the ground. With this method, a hollow -stem auger is drilled to the desired sampling depth. A 2-inch OD <br />sampling tube is then screwed onto the end of a sampling rod, inserted through the hole in the auger's tip, <br />and then driven into the soil with a 140-pound hammer dropped repeatedly from a height of 30 inches above <br />the sampling rod. The sampler is driven 18 inches into the soil unless the material is too hard. The samples <br />are generally taken at 21/2 to 5-foot intervals. The core of soil obtained was classified and logged by our <br />drilling personnel at the site and a representative portion was then sealed and delivered to our laboratory for <br />further review. <br />At the surface, the pavement borings encountered about 1 1/2 to 5 inches of asphalt over 0 to 8 inches of <br />aggregate base or recycled aggregate. Several borings encountered about 1/2 foot or less of buried topsoil <br />below the pavement materials. <br />Below the surface materials, most of the borings encountered fill to possible fill to depths of 1 to 6 1/2 feet. <br />The fill consisted primarily of rather clean sands to silty sands. <br />Below the surface materials and fill, most of the borings were dominated by clean sands natural sands <br />(poorly graded sand and poorly graded sand with silt). Boring B-02 encountered a layer of clayey sand at <br />the 10-foot termination depth. <br />For the reader's convenience, we have summarized the soil boring data in the following cross-section. <br />The reader is referred to the boring logs in the Appendix for more detailed information. <br />911 <br />909 <br />907 <br />905 <br />903 <br />a� <br />901 <br />LL <br />899 <br />897 <br />0 <br />895 <br />893 <br />891 <br />.0 889 <br />EL 887 <br />CL <br />a 885 <br />883 <br />881 <br />879 <br />877 <br />875 <br />North <br />-----------------------South <br />------------------------------------------------------------------------------------------------------------------------------------------------------------ <br />10 9 8 7 6 5 4 3 2 1 <br />Boring Number <br />in Pave Mat'I <br />■ Topsoil <br />o Fill -Silty Sand <br />® Fill -Sand <br />❑Sand <br />m Clayey Sand <br />❑ Below Boring <br />M I N N E S 0 T A 1 0 W A W I S C 0 N S I N <br />