Laserfiche WebLink
Memorandum <br />To: Joe Feriancek, PE <br />From: Andrea Blanchette, PE <br />Tom Wood <br />Sheue Torng Lee <br />Date: March 4, 2020 <br />Re: Pavement Coring Forensic Report <br />City of Ramsey <br />WSB Project No. 015656-000 <br />2 Introduction <br />0 <br />U <br />c� WSB is pleased to submit this pavement forensics report detailing the results of the pavement <br />w coring which was completed on March 2, 2020 in the City of Ramsey. The various characteristics <br />U) of the pavement cores were summarized to provide information to the City to assist in <br />determining the appropriate pavement maintenance or rehabilitation method for the roadways. <br />0 <br />CD 00 <br />A total of 8 (6 of which were taken in a patched area) pavement cores were obtained in the <br />Business Park 95 Project Area and a total of 12 cores were obtained in the Regency Pond <br />Project Area. The locations of the pavement cores are summarized in Figure 1 and Figure 2. A <br />CO summary of the pavement depths and conditions for the streets are shown in Table 1. Pictures of <br />the cores obtained can be found in the Appendix. <br />Z <br />Cn <br />J <br />0 <br />n <br />Q <br />W <br />Z <br />Z <br />73 <br />0 <br />0 <br />M <br />W <br />H <br />D <br />T <br />W <br />Z) <br />Z <br />W <br />Q <br />Q <br />Z <br />W <br />X <br />0 <br />ti <br />