Laserfiche WebLink
LOG OF BORING <br />CHOSEN VALLEY TESTING <br />PROJECT: 17624.20.MNS <br />BORING: B-1 <br />Design Phase Geotechnical Evaluation <br />LOCATION: <br />Proposed Business Park <br />See attached sketch <br />Unity Street NW <br />Ramsey, Minnesota <br />DATE: 11/24/2020 <br />SCALE: III= 2' <br />Elev. <br />Depth <br />p <br />USCS <br />Description of Materials <br />gpF <br />WL <br />Tests and Notes <br />865.5 <br />0.0 <br />Symbol <br />(ASTM D 2487/2488) <br />1.5" BITUNIINOUS <br />RECYCLED BITUMINOUS <br />Sp <br />SM <br />�.�' <br />3" AGGREGATE BASE <br />POORLY GRADED SAND with SILT, mostly fine <br />9: <br />to medium grained, trace gravel, brown, moist, loose <br />to medium dense. <br />(Possible Fill) <br />15 <br />11 <br />10 <br />8 <br />854.5 <br />11.0 <br />End of boring. <br />Water not encountered during drilling. <br />Boring sealed upon completion. <br />17624.20.MNS B-1 page 1 of 1 <br />