Laserfiche WebLink
CC Regular Session 5.16. <br />Meeting Date: 01/12/2021 <br />Submitted For: Bruce Westby, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #21-011 Ordering Plans and Specifications for Improvement Proj ect # 21-04, 2021 Neighborhood <br />Pavement Overlay Improvements. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-011 Ordering Plans and Specifications for Improvement Project <br />#21-04 2021 Neighborhood Pavement Overlay Improvements. <br />Background: <br />Overlaying the streets identified within the 2021 — 2030 Capital Improvement Program for 2021 will allow the City <br />to maintain these streets in the most cost-effective manner throughout the serviceable life of the streets. <br />Exhibits are attached showing the specific street segments proposed to receive bituminous pavement overlay <br />improvements in 2021. These street segments are located in the following developments: <br />• Birch Hill Lodges <br />• Ferrum 1 st & 2nd <br />• Gateway Industrial Park <br />• Mallard Ponds <br />• Northfork Itasca Point <br />• Northfork St. Andrews <br />• Oakridge Industrial Park <br />• Rabbit Run <br />• Ramsey Meadows 2nd <br />A street segment summary is attached, the proposed project is 1.81 miles in total length. <br />The proposed improvements are designated as City Improvement Project #21-04, 2021 Neighborhood Pavement <br />Overlay Improvements. <br />Notification: <br />No notifications are required with this case. <br />Observations/Alternatives: <br />Motion to adopt Resolution #21-011 ordering plans and specifications for improvement project #21-04, 2021 <br />Neighborhood Pavement Overlay Improvements. <br />Funding Source: <br />