My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/12/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 01/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:49:51 PM
Creation date
1/21/2021 12:31:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5.17. <br />Meeting Date: 01/12/2021 <br />Submitted For: Bruce Westby, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #21-012 Ordering Plans and Specifications for Improvement Project # 21-05, 2021 MSA <br />Pavement Overlay Improvements. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-012 Ordering Plans and Specifications for Improvement Project <br />#21-05 2021 MSA Pavement Overlay Improvements. <br />Background: <br />Overlaying the Municipal State Aid (MSA) streets identified within the 2021 — 2030 Capital Improvement Program <br />for 2021 will allow the City to maintain these streets in the most cost-effective manner throughout the serviceable <br />life of the streets. <br />The MSA street segments proposed to receive bituminous pavement overlay improvements in 2021 are: <br />• Sunwood Drive between Bunker Lake Boulevard and Sunfish Lake Boulevard <br />• Sunwood Drive between Erkium Street and Trunk Highway 47 <br />A street segment summary is attached. The proposed project is 0.72 miles in total length. <br />The proposed improvements are designated as City Improvement Project #21-05, 2021 MSA Pavement Overlay <br />Improvements. <br />Notification: <br />No notifications are required with this case. <br />Observations/Alternatives: <br />Motion to adopt Resolution #21-012 ordering plans and specifications for improvement project #21-05, 2021 MSA <br />Pavement Overlay Improvements. <br />Funding Source: <br />Staff estimates project costs, based on anticipated 2021 construction costs, to be $324,000. <br />Plans and specifications will be prepared in-house as part of Staffs normal duties. <br />Funding for this improvement is proposed to come from the MSA Fund and Stormwater Utility Fund. <br />• Street Project Cost $313,000 <br />• Storm Sewer Project Cost $ 11,000 <br />• Total Estimated Project Cost $324,000 <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.