Laserfiche WebLink
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />Date <br />11/20/2020 <br />Project Site <br />PID: Bacon Property <br />Project Title <br />20-138 Bacon Subdivision <br />Escrow # <br />Department: <br />Community Development: Planning Division <br />Technical <br />Reviewer: <br />Name: Chloe McGuire <br />Phone: 763-433-9821 <br />Email: cmcguire@cityoframsey.com <br />Required Steps <br />1. Free Pass (We're here) <br />2. Sketch Plan —Planning Commission <br />3. Site Plan —Planning Commission +City Council <br />4. Final Plat —City Council <br />Site Plan Review <br />Notes: <br />• Please see ProjectDox (electronic plan review) comments from Staff. <br />• Seems to generally meet R-1 Rural Developing <br />Comprehensive Plan: The property is currently guided as Rural Developing in the 2040 Comprehensive <br />Plan. This designation would allow for larger lots on private well and septic. <br />Zoning: The site is currently zoned as R-1 Rural Residential. This allows for 2.5 acre lots on well and <br />septic. <br />Number of Lots: The Applicant has provided two concept plans, a preferred concept plan with 9 lots, <br />and a secondary concept plan with 19 lots. Staff reviewed both proposals. <br />R-1 Residential (MUSA) Single Family Detached Standards <br />Standard <br />Required <br />Proposed (on both <br />concepts) <br />Minimum Lot Size <br />2.5 acres <br />2.5 acres + <br />Minimum Lot Width <br />200 feet <br />200 feet/100 feet on cul- <br />de-sac <br />Minimum Buildable Acreage (net) <br />1 acre <br />All >1 acre <br />Density Transitioning <br />Required when abutting less <br />dense developments. <br />N/A <br />