Co',d TRUC"T 10 INV <br />III <br />i uui��li uuuuiumii <br />Follow us on Twitter qprjrnconstruction <br />City f III''t iii m ey Il vuu iii c W <br />Pr guess ''IIIpil <br />J a iry 211, 2 21 <br />Warm storage precast has been erected. Mezzanine plank <br />bearing structural steel erection is ongoing. Precast plank for <br />mezzanine in warm storage is scheduled for the week of <br />January 25th, 2021. Joist and decking installation is <br />scheduled for the week of February 8th, 2021. <br />West exterior elevation of building. Precast wall erection is <br />complete and precast plank roof is completed over washbay <br />(2nd overhead door from right hand side). Precast plank is <br />used as the roof structure for the washbay to minimize <br />corrosion occuring due to the high moisture environment of <br />the washbay. <br />Last of the precast wall panels being installed at the future <br />multipurpose/kitchen. This elevation will have a large glass <br />window system to allow for natural light. An exterior door <br />will be installed for access to the patio just outside this <br />room. <br />discover the projects <br />RJMBuolds <br />