My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 11/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:09:07 PM
Creation date
1/27/2021 11:46:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION: The City of Ramsey (City) is requesting proposals for the preparation and <br />delivery of a geotechnical report along Tiger Street between Armstrong Boulevard and 173rd <br />Avenue, as shown in the attached exhibit. Tiger Street is 24-foot wide rural section street, with a <br />30 mph speed limit. The scope of this work includes: <br />• 10 soil borings per the attached exhibit <br />• A standard geotechnical report including construction feasibility for public utilities and <br />pavement section <br />• Logs of soil borings with descriptions of nomenclature used for defining the site soils <br />• Estimated subgrade support strength parameters for design of the bituminous roadway and <br />recommendations for soil corrections <br />• Recommendations for earthwork associated with installation of storm sewer <br />• Recommendations for management of groundwater for design of structures and pavements <br />SOIL BORING REQUIREMENTS: Soil borings to a depth of 10-feet will be taken at stationing <br />shown on the attached "Boring Hole Location" exhibit. Soil borings will alternate between drive <br />lanes. Cores of the existing bituminous pavement will be required. Cores will be taken to verify <br />thickness and structural integrity of the existing pavement and base. Pictures of the cores will be <br />included in the final report. Any additional depth beyond 10-feet will be paid per lineal foot. The <br />Contractor must perform sufficient survey work to locate holes approximately 5 feet horizontally <br />and approximately 0.5 feet vertically. The Contractor is responsible for locating all utilities prior <br />to starting boring operations. <br />SOIL BORING LOG REQUIREMENTS: A field boring log will be prepared by the Contractor <br />for each boring with a copy included in the final report. The field boring logs will include the <br />following information: <br />• The project identification number <br />• Location of the boring referenced by centerline stationing using the Anoka County <br />Coordinate System with NAD 83 <br />• Boring log number <br />• Method of drilling and sampling, diameter of bore hole <br />• Date, name of driller and crew <br />• Ground surface elevation and ground water elevation measured to the nearest 0.5 feet <br />• Definition of all symbols that are not otherwise self-explanatory <br />• Classification, thickness, color, moisture condition (dry, moist, wet, saturated), <br />composition and degree of compactness <br />• Field number of any samples taken, type of sample and depth taken <br />• Depth at which obstacles were encountered in advancing the boring <br />• Any other unusual conditions encountered during drilling and sampling <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.