Laserfiche WebLink
ESTIMATE DATE: <br />PROJECT: <br />ARCHITECT: <br />DRAWING DATE: <br />October 30, 2020 <br />City of Ramsey Public Works <br />Oertel <br />September 29, 2020 <br />DESCRIPTION <br />Sub Contractors <br />Final <br />Estimate <br />$/sf <br />86,018 <br />Construction Costs <br />1A - Special Inspections <br />City of Ramsey <br />$52,800 <br />$0.61 <br />1B - Surveying <br />Hakanson Anderson <br />$22,160 <br />$0.26 <br />1C - Final Cleaning <br />Midwest Specialty Maintenance <br />$49,247 <br />$0.57 <br />3A - Cast -in -Place Concrete <br />Northland Concrete and Masonry <br />$1,194,000 <br />$13.88 <br />3B - Precast Structural & Architectural Concrete <br />Moline <br />$1,379,458 <br />$16.04 <br />3C - Polished and Sealed Concrete <br />Donlar <br />$81,225 <br />$0.94 <br />4A - Unit Masonry <br />Steenburg Watrud <br />$213,240 <br />$2.48 <br />5A - Structural Steel/Misc. Metals - Material <br />Thorneburg Steel <br />$754,161 <br />$8.77 <br />5B - Structural Steel & Misc. Metals - Erection <br />MetCon Construction <br />$249,000 <br />$2.89 <br />6A - Carpentry Materials and Install <br />Ebert Construction <br />$152,700 <br />$1.78 <br />7A - Waterproofing & Weatherproofing <br />Herzog Coatings <br />$41,000 <br />$0.48 <br />7B - Architectural Metal Panels <br />Atomic Architectural Sheet Metal <br />$220,200 <br />$2.56 <br />7C - EPDM Roofing <br />Granite City Roofing <br />$767,000 <br />$8.92 <br />7D - Joint Sealants <br />WCS1 LLC <br />$9,448 <br />$0.11 <br />8A - Doors, Frames and Hardware - Materials <br />Bredemus Hardware <br />$111,795 <br />$1.30 <br />8B - Overhead Coiling Doors <br />Twin City Garage Door <br />$17,000 <br />$0.20 <br />8C - Accordian Security Doors <br />Won Door <br />$20,273 <br />$0.24 <br />8D - Sectional Overhead Doors <br />Twin City Garage Door <br />$196,650 <br />$2.29 <br />8E - Aluminum Framed Storefronts & Entrances <br />Top Lite Contract Glazing <br />$143,000 <br />$1.66 <br />8F - Translucent Wall Panels <br />W.L. Hall <br />$84,737 <br />$0.99 <br />9A - Gypsum Board Assemblies <br />RTL Construction <br />$234,733 <br />$2.73 <br />9B - Tiling <br />Tims Construction Group <br />$35,882 <br />$0.42 <br />9C - Acoustical Ceilings <br />Acoustic Associates <br />$32,500 <br />$0.38 <br />9D - Carpet and Resilient Base <br />Henricksen <br />$16,572 <br />$0.19 <br />9E - Painting <br />Swanson and Youngdale <br />$165,781 <br />$1.93 <br />10A - Signage <br />Spectrum Signs <br />$16,431 <br />$0.19 <br />10B - Specialties Materials <br />Construction Supply Inc. <br />$15,783 <br />$0.18 <br />10C - Lockers <br />Olympus <br />$52,713 <br />$0.61 <br />10D - Operable Partitions <br />Acoustic Associates <br />$19,497 <br />$0.23 <br />11A - Vehicle Wash Equipment <br />RJM Allowance <br />$75,000 <br />$0.87 <br />11B - Vehicle Fueling System <br />Pump and Meter Service <br />$292,572 <br />$3.40 <br />11C - Loading Dock Equipment <br />Star Equipment <br />$11,695 <br />$0.14 <br />12A - Window Treatments <br />RJM Allowance <br />$45,000 <br />$0.52 <br />12B - Casework Materials <br />Distictive Cabinet Design <br />$58,672 <br />$0.68 <br />14A - Vehicle Lifts <br />Midwest Lift Works <br />$281,054 <br />$3.27 <br />21A - Fire Supression Systems <br />Brothers Fire and Security <br />$147,800 <br />$1.72 <br />22A - Plumbing Systems <br />Klamm Mechanical Contracts <br />$944,250 <br />$10.98 <br />23A - HVAC Systems <br />Architect Mechanical <br />$1,216,000 <br />$14.14 <br />26A - Electrical Systems <br />Wolf River Electric <br />$792,196 <br />$9.21 <br />31A - Earthwork <br />MUE <br />$636,549 <br />$7.40 <br />32A - Asphalt Paving <br />Northland Paving <br />$619,000 <br />$7.20 <br />32B - Concrete Paving <br />Stapf Concrete Construction <br />$124,900 <br />$1.45 <br />32C - Fences and Gates <br />Midwest Fence <br />$313,330 <br />$3.64 <br />32D - Landscaping <br />Peterson Companies <br />$68,219 <br />$0.79 <br />33A - Utilities <br />Jacon <br />$503,809 <br />$5.86 <br />41A - Overhead Crane System <br />Aero Material Handling <br />$83,348 <br />$0.97 <br />