My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 11/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:09:07 PM
Creation date
1/27/2021 11:46:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1044547 <br />7. Basis of State Cost <br />7.1. Schedule "1". The Preliminary Schedule "I" includes all anticipated State participation construction items <br />and the cost share covered under this Agreement. <br />7.2. State Participation Construction. The State will participate in the following at the percentages indicated. <br />A. 100 Percent will be the State's rate of cost participation in the T.H. 47 storm sewer construction as <br />shown in the Preliminary Schedule T. The construction includes, but is not limited to, those <br />construction items tabulated on Sheet No. 2 of the Preliminary Schedule "I". <br />B. 100 Percent will be the State's rate of cost participation in the T.H. 47 paving construction as shown in <br />the Preliminary Schedule "I" up to the capped amount. The construction includes, but is not limited to, <br />those construction items tabulated on Sheet No. 3 of the Preliminary Schedule "I". The State's cost <br />participation for those paving items is capped at $200,000.00. <br />C. 50 Percent will be the State's rate of cost participation in the T.H. 47 at C.S.A.H. 116 (Bunker Lake <br />Boulevard) signal system and EVP system construction as shown in the Preliminary Schedule "I" up to <br />the capped amount. The construction includes, but is not limited to, those construction items tabulated <br />on Sheet No. 4 of the Preliminary Schedule "I". The State's cost participation for those signal system <br />and EVP system items is capped at $120,000.00. <br />7.3. State Furnished Materials. The State will furnish a Type "R" cabinet, Gridsmart video detection system, an <br />additional Gridsmart camera, and a PTZ camera ("State Furnished Materials"), according to the Project <br />Plans, to operate the traffic control signal system covered under this Agreement. The County's lump sum <br />share for State Furnished Materials is $26,457.34. The State's lump sum share for State Furnished <br />Materials is $26,457.35 and is considered a part of the State's total lump sum cost. The County's cost share <br />for State Furnished Materials will be deducted from the State's total lump sum construction cost share as <br />shown in the Schedule T. <br />8. State Cost and Payment by the State <br />8.1. State Cost. $405,583.66 is the State's estimated share of the costs of the contract construction (less State <br />Furnished Materials cost) and a $10,000.00 contingency amount as shown in the Preliminary Schedule "I". <br />The Preliminary Schedule "I" was prepared using estimated quantities and unit prices, and may include any <br />credits, lump sum costs, or capped amounts. Upon review of the construction contract bid documents <br />described in Article 3.2., the State will decide whether to concur in the County's award of the construction <br />contract and, if so, prepare a Revised Schedule "I" based on construction contract unit prices, which will <br />replace and supersede the Preliminary Schedule "I" as part of this Agreement. The contingency amount is <br />provided to cover increased State cost in order to prepare the Revised Schedule "I" with contract unit <br />prices. <br />8.2. Conditions of Payment. The State will pay the County the full and complete lump sum amount as shown in <br />the Revised Schedule "I", after the following conditions have been met: <br />A. Encumbrance by the State of the State's full and complete State funded lump sum cost share as shown <br />in the Revised Schedule "I". <br />B. Execution of this Agreement and transmittal to the County, including a letter advising of the State's <br />concurrence in the award of the construction contract. <br />C. The State's receipt of a written request from the County for the advancement of funds. The request will <br />include certification by the County that all necessary parties have executed the construction contract. <br />-7- <br />Payable Lump Sum on Low Bid (Cooperative Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.