My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 02/11/2021
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2021
>
Agenda - Economic Development Authority - 02/11/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:35:08 PM
Creation date
2/5/2021 10:55:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
02/11/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0r11zrral Resources (Section 106) <br />Information on the locations of potential cultural resource properties within the study area was <br />obtained from the State Historic Preservation Offices (SHPO) History/Architecture Inventory <br />and Archaeological Site Location Inventory. <br />The History/Architecture Inventory identified two properties near the corridor. The first site, the <br />District No. 28 School, is north of the intersection of County Road 116 and TH 47. The second <br />site, 6030 Industry Avenue, identified as "house", is along the south side of County Road 116 <br />between CSAH 57 (Sunfish Lake Boulevard) and TH 47. <br />The District No. 28 School site is on the National Register of Historic Places (NRHP). Any <br />alternatives impacting this property should be avoided. The second property, the "house", has <br />not been evaluated for NRHP eligibility. Photographic records suggest the property may no <br />longer possess integrity. Further evaluation is needed to determine its eligibility status. <br />Figure 12 shows the locations of both sites. <br />State Historic Preservation Office records include reports of three archaeological investigations <br />in the Rivers Bend Park area, suggesting high potential for archaeology in this area. A Phase I <br />Cultural Resources Study will be needed to identify potential archaeological sites adjacent to the <br />corridor and evaluate nearby structures greater than 50 years old. At minimum, alternatives <br />should avoid impacts to the District No. 28 School, which is listed on the National Register of <br />Historic Places. It should be noted that this area of the corridor is already four lanes, and that <br />additional expansion is unlikely at this time. <br />Endangered Species Act <br />The Minnesota Natural Heritage database file search conducted by the Minnesota DNR <br />determined that there are several sites within the project area with state threatened and <br />endangered species and natural communities (see complete list in Appendix A). Of the 14 rare <br />features within a one -mile radius of the project area, only one is actually in the study area. The <br />state threatened Blanding's turtle (Eznvdoidea blandingii) was reported within a one -mile radius <br />of the study area. Due to the sensitive nature of threatened and endangered species, and the fear <br />of habitat destruction, the location of the turtle's habitat is not shown on Figure 12. <br />Blanding's turtles need both wetland and upland habitats to complete their life cycle. Nesting <br />females and hatchlings are often at risk of being killed while crossing roads between wetlands <br />and nesting areas. In addition to movements associated with the nesting, all ages and both sexes <br />move between wetlands from April to November. These movements peak in June and July and <br />again in September and October as turtles move to and from over wintering sites. In late <br />autumn, the turtles bury themselves in the mud at the bottom of the deeper wetlands to over <br />winter. <br />A preliminary survey of the study area should be carried out to determine the potential for <br />Blanding's turtle habitat. If it is determined there is turtle habitat within the study area, corridor <br />improvement alternatives should be selected to avoid impacting the habitat. If impacts are <br />unable to be avoided, recommendations for avoiding and minimizing impacts to turtle habitat <br />SRF Consulting Group, Inc. - 27 - February 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.