Laserfiche WebLink
request docurnenw Related ES# <br />Search Radius ml. ER/All EOs <br />Quads <br />Map'd _ C NoC Let Inv Log out <br />MINNESOTA NATURAL ItERITAGE INFORMA11ON SYSTEM DATA REQUEST FORM <br />"Requests generally take 2 to 3 weeks from date of receipt to process, and are processed in the order received." <br />DATE OF REQUEST November 2, 2001 <br />WHO IS REQUESTING THE INFORMATION? <br />Name and Title Courtnav Bot, Environmental Planner <br />A2ency/CuanY _ SRF Consulting Group, Inc. <br />Address e Carlson Paricwav Korth, Suite 150 Minneanolis MN 55447-4443 <br />(stile) Cal, Code) <br />(Street) <br />Phone 612/475-0010 FAX 612/475-2429 e-mal cbot & srfconsuitim.corn <br />WHAT INFORMATION DO YOU NEED? <br />x Known occurrences of federally and state listed plants and animals; high quality plant <br />communities; and a egation sites such as bat hibernacula, colonial waterbird <br />nesting sites, and prairie chicken booming grounds. <br />x Information listed above, plus geological features and state rare species with no legal status. <br />Other(specify): <br />Precinent applicants: Check bore if yon DO NOT need a copy of the field -by -field explanation of the printout <br />WHERE IS THE AREA OF INTEREST? 1) ENCLOSE A MAP showing detailed boundaries of the <br />area. 2) Describe the area (PROJECT REVIEW applicants may omit area description but mast enclose a map). <br />See attached map <br />FOR PROJECT REVIEWS: If data are being requested for review of a project (developments, road <br />improvements/repair, mining, etc.), provide the following: <br />County Twnshp# Range# Section(s) (or half-secfion, miarter-section, etc., if known). <br />Anoka 32 N 24 W Section 30 <br />Anoka ' 32 N 25 W Sections 25, 26, 27, 28, 29, 35, 36 <br />Project Name County Road 116 Corridor Study <br />Project Proposer Anoka County and the Cities of Ramsey and Anoka <br />Project Description A Corridor Study is being completed to analyze Potential geometric and access <br />management improvements alone the existing CR 116 from CSAH 83 to CR 7. The Corridor Study will <br />also include information about a proposed connection of CR 116 to Trunk ghway(TH) 10. <br />Past Land -Use of Project Site Roadway land use from CSAH 83 to CR 7. Farmland and vacant land, <br />use from TH 10 to CSAH 83. <br />(OVER) <br />