My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Economic Development Authority - 02/11/2021
Ramsey
>
Public
>
Agendas
>
Economic Development Authority
>
2021
>
Agenda - Economic Development Authority - 02/11/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:35:08 PM
Creation date
2/5/2021 10:55:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Economic Development Authority
Document Date
02/11/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. USE OF COUNTY PROPERTY <br />A. The County agrees to accommodate the storm water pipe and storage ponds for the RTC <br />development on property located south of T.H. 10. Three issues need to be resolved to <br />the satisfaction of the County by the City. First, the site has been secured with the <br />intention of building a river crossing approach on that property. Secondly, the existence <br />of a five year "License Agreement" with Diamonds Sports Bar and Grill for the use of the <br />property for special events. There is at least an expectation that Diamonds Sports Bar <br />and Grill would be compensated for their costs, should the property be unavailable to <br />them for the initial five year period ending February 2008. Third, the alternate use of that <br />property from the County perspective would be as replacement property for a County <br />project related to "4-F" or "6-F" encroachment elsewhere in the County. <br />B. The City is to agree that they will be responsible to find, design, construct and pay for <br />drainage and storage alternatives if the river crossing is built in this corridor. <br />C. The City will facilitate the cancellation of the five-year parking agreement with Gary <br />Gruber at Diamonds Sports Bar and Grill. At a minimum, the City must obtain a letter <br />from Diamonds Sports Bar and Grill which allows the County to rescind the existing <br />license agreement between the County and Diamonds Sports Bar and Grill at no cost to <br />the County. <br />D. The City will assist the County in finding suitable replacement property for 4F or 6F <br />encroachments on other park land for a potential river crossing between Dayton and <br />Ramsey, regardless of the alignment. The City's responsibility in the procurement of <br />replacement property for 4F or 6F impacts will be limited to the acquisition of 4.47 acres <br />of replacement property with a value of not less than $447,000. <br />4. ACCESS TO COUNTY HIGHWAY <br />A. Only three (3) full turn accesses will be allowed from the RTC development to Bunker <br />Lake Boulevard (C.R. 116). These accesses will line up with accesses on the north side <br />of Bunker Lake Boulevard (C.R. 116) for a total of six access points as directed in the <br />Highway 116 Corridor Study. No additional right -in, right -out accesses onto Bunker <br />Lake Boulevard (C.R. 116) are being allowed at this time. This provision is in agreement <br />with the original Joint Powers Agreement between the City and the County at the time <br />the roadway (C.R. 116) was constructed. <br />B. A total of three accesses are acceptable along the west side of Ramsey Boulevard <br />(C.R. 56) as follows: <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.