My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/08/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 02/08/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:52:01 PM
Creation date
2/5/2021 11:21:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/08/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
times, variable water usage patterns by municipal water consumers, and proposed system expansions. <br />3. Prepare Preliminary Design Report. Prepare a preliminary design report exploring available options and <br />recommending preferred processes for treating known and emerging contaminants that will potentially need <br />to be treated over the anticipated life of a centralized water treatment facility in the City of Ramsey. The <br />report must examine available treatment process options for identified contaminants potentially needing <br />treatment, recommend a preferred treatment process for each identified contaminant, identify required space <br />needs for preferred treatment processes, identify anticipated expansion needs, provide a recommendation as <br />to the required size and preferred location for the facility, and provide cost estimates for constructing and <br />operating the facility over its anticipated life. <br />On October 8, 2019, the Ramsey City Council adopted Resolution #19-248 awarding a contract to SEH Inc. for <br />Improvement Project #19-12. SEH, Inc. has since completed a draft Feasibility Study addressing the three general <br />areas outlined above, and their findings are generally as follows. <br />• The TCW aquifer will be able to continue to produce potable water to meet present and foreseeable future <br />demands. <br />• The most cost-effective method for removing manganese and iron from the City's drinking water is chemical <br />oxidation followed by sand filtration. These processes require construction of a water treatment plant. <br />• Based upon an analysis of Ramsey's 2040 water demand, the initial capacity of the water treatment plant <br />should be 10 million gallons per day (MGD), with the ability to expand to 20 MGD. <br />• Four water treatment plant sites were evaluated including the Fire Station site, Public Works site, Water Shop <br />site, and Vacant City property site. The Public Works site is recommended since it requires the least overall <br />construction costs and offers the greatest operational efficiencies. In addition, in January of 2020 the City of <br />Ramsey's Planning Commission, Economic Development Authority, and Public Works Committee all voted <br />unanimously to recommend City Council approval to construct the water treatment plant on the Public Works <br />site. <br />• Two treatment process alternatives were evaluated including gravity filtration and pressure filtration. Gravity <br />filtration is recommended. <br />It should be noted that Chris Larson, the former project manager with SEH, Inc. who developed the draft Feasibility <br />Study and previously met with the City Council to discuss this project, left SEH in late December. The new project <br />manager from SEH is Mr. Miles Jensen, who had worked closely with Chris to preform QA/QC reviews on the <br />draft Feasibility Study. Mr. Jensen is therefore very familiar with this project, and will now be responsible for <br />completing the project for SEH. <br />Next Steps <br />The City has been able to continue to supply its municipal water users with safe potable water without interruption <br />by running the three municipal wells with the lowest manganese concentrations continually for almost 2 years now, <br />which has and will continue to cause the existing water supply system infrastructure to wear out faster than normal. <br />The City has been utilizing Wells #5, #6 and #7 since April of 2019. Since such time, we have been running these <br />three wells almost non-stop, which is very hard on moving parts such as meters, motors and pumps. Last fall the <br />City had to repair Well #7, during which time it was out of service. Then early this winter the same repairs were <br />needed to Well #6, requiring this well to be shut down for a month while it was repaired. Luckily, these repairs <br />were not needed during our peak water use time during the summer months when people area watering lawns, <br />tilling swimming pools, washing their cars, etc. <br />The City also recently had to replace the water meter at Well #6, and have had ongoing issues with Well #7's water <br />meter. A cooling unit also failed recently in the service cabinet for Well #6, which can cause the well to overheat <br />and shut down. Staff believes the constant use of these wells contributed in large part to the required repairs. We <br />have been lucky so far that the repairs were not needed during the summer during peak water use. If one of the <br />wells would need to be repaired during the summer we would need to rely on another well with higher manganese <br />concentrations, which would increase manganese concentrations throughout the system. Staff therefore <br />recommends moving forward with implementation of the water treatment plant project as soon as possible. <br />
The URL can be used to link to this page
Your browser does not support the video tag.