Laserfiche WebLink
constructed between 2022 and 2025. Therefore, to construct the raw and finished watermain <br />associated with the water treatment plant project as cost-effectively as possible, plans and <br />specifications for the raw and finished watermain improvements are recommended to be <br />prepared and bid in conjunction with Anoka County's proposed improvements to Bunker Lake <br />Boulevard. <br />FEASIBILITY STUDY - DRAFT RAMSY 154354 <br />Page 44 <br />