Laserfiche WebLink
CASE # <br /> <br />REPORT ON MEETING WITH MALLARD ESTATES TOWNHOME <br />ASSOCIATION REGARDING THE REMOVAL OF THE ARGON STREET <br />GATED ACCESS <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />Chicl' Way and I met with the three member board of the Mallard Estates Townhome <br />Association on June 9th to discuss the issue of removing the gated access across <br />Argon Street. Our presentation focused on implementing some temporary street <br />closures and collecting before and after traffic counts to determine the extent of the <br />tral'fic change. The City would then negotiate with the board to make the traffic <br />modifications permanent. <br /> <br />Wc wcrc told that this issue would need to be put to a vote of the members and that <br />such a proposal would be resoundingly defeated since the residents feel that any <br />additional traffic would be considered intolerable. However the board did feel that <br />that an opportunity for the removal of the gate did exist provided that the alternative <br />did not appear to be a throughway. It was suggested that a narrow passage might be <br />acceptable. It seemed that a sensitive point with the association is that the existing <br />gate is not very aesthetic and an alternative that would improve the appearance of this <br />area could garner acceptance. The City would also add appropriate signage to make it <br />clear that this was a private road, however care will need to be taken with regards to <br />thc aesthetics of this signage. <br /> <br />At thc end of thc meeting it was agreed that the City would respond with a specific <br />proposal for remodeling of this access point that the board could present to their <br />members. Such a proposal should include a visual rendering which would emphasize <br />thc aesthetics of the proposal. <br /> <br />Recommendation: <br /> <br />13ascd upon discussion <br /> <br />Reviewed By: <br />Public Works Director/Fire Chief <br />Assistant Public Works Director/Principal Engineer <br />Public Works Street Supervisor <br />Police Cbicf <br /> <br />PW: 06/21/05 <br /> <br /> <br />