Laserfiche WebLink
PAY ESTIMATE #'1 Engineer <br /> Ramsey Town Center Phase 2, Segment 1 Improvements <br /> Zeolite Street NW, Civic Center Drive NW and Sapphire Street NW - ' <br /> Improvement Project No. 05-22 ' <br /> <br />BID sCHEDULE "A" - CONTINUED <br /> <br /> Used to <br />Item Description Estimated Quantity Unit Price Contract Price Date Extension <br /> <br /> 46 EXTRA DEPTH MANHOLE (OVER 8") 48 31 LF $100.00 $ 3,100.00 25 $ 2,500.00 <br /> 47 4" CONCRETE WALK 2500 SF $3.00 $ 7,500.00 <br /> 48 VALLEY GUTTER 780 LF $14.00 $ 10,920.00 <br /> 49 CONCRETE CURB AND GU'VrER DESIGN B618 5700 LF $8.00 $ 45,800.00 $ <br /> 50 CONCRETE CURB AND GU"I-I'ER DESIGN B624 132 LF $17.00 $ 2,244.00 $ <br /> 51 7" CONCRETE DRIVEWAY PAVEMENT 2450 SF $3.90 $ 9,555.00 $ <br /> 52 ~EDESTRIAN CURB RAMP 2 EACH $360.00 $ 720.00 <br /> 53 F & I 2- RIGID STEEL CONDUIT 89 LF $4.00 $ 356.00 $ <br /> 54 F & I 4,' RiGiD STEEL CONDUIT 178 LF $5.00 $ 890.00 $ <br /> 55 SIGN PANELS TYPE C 30.75 SF $28.00 $ 861.00 $ <br /> 56 TRAFFIC CONTROL 1 LS $750.00 $ 750.00 $ <br /> 57 TYPE III BARRICADE 4 EACH $245.OO $ 980.00 <br /> 58 ~AVEMENT MESSAGE (LEFT ARROW) EPOXY 4 EACH $100.00 $ 400,00 $' <br /> 59 F & I SIGN PANEL TYPE ,,D" 3 EACH $275.00 $ 825.00 $ <br /> 6o 4" BROKEN LINE YELLOW EPOXY 2645 LF $0.01 $ 26,45 $ <br /> 61 4" SOLID LINE WHITE - EPOXY 3045 LF $0.50 $ 1,522,50 <br /> 62 24" STOP LINE WHITE - EPOXY 53 LF $5.15 $ 272,95 $ <br /> 63 4" DOUBLE LINE BROKEN & SOLID YELLOW- EPO> 515 LF $0.50 $ 257,50 $ <br /> 64 _~4" SOLID LINE WHITE - EPOXY 44 LF $5.15 $ 226,60 $ <br /> 65 4" SOLID LINE WHITE - PAINT 2675 LF $0.38 $ .1,016.50 $ <br /> 66 4" DOUBLE LINE BROKEN & SOLID YELLOW- PAIN' 515 LF $0.38 $ 195.70 $ <br /> 67 NSTALL 4" _ 6,, PVC (SCH40) CONDUIT 600 LF $3.00 $ 1,800.00 $ <br /> 68 3ALE CHECK 50 EACH $10.00 $ 500.00 $ <br /> 69 SILT FENCE TYPE MACHINE SLICED 6000 LF $1.65 $ 9,900.00 <br /> 70 TEMPORARY CONSTRUCTION ROCK ENTRANCE 2 EACH $750.00 $ 1,500.00 $ <br /> 71 .~EEDING 2.0 ACRE $500.00 $ 1.000.00 $ <br /> 72 SEED MIXTURE 260 200 LB $2.20 $ 440.00 $ <br /> 73 VIULCH MATERIAL TYPE 3 4 TON $145.00 $ 580.00 $ <br /> 74 EROSION CONTROL BLANKETS CATEGORY 3 4000 SY $1.70 $ 6,800.00 $' <br /> 75 COMMERCIAL FERTILtZERANALYSIS 24-2-24 700 LBS $0.40 $ 280.00 <br /> <br />Total Bid Schedule "A" - Street Construction $ 562,023.30 $ 180,149.00 <br /> <br />SUMMARY OF BIDDING <br /> <br />Bid Schedule "A" - Street Construction . <br />Base Bid Total <br /> <br />$ 562,023.30 $ 180,149.00 <br />$ 562,023.30 $ 180,149.00 <br /> <br />$ 562,023.30 $ 180,149.00 <br /> $ 9,007.45 <br /> $ 171,141.55 <br /> <br />TOTAL <br /> <br />LESS 5% RETAINAGE <br />WE RECOMMEND PAYMENT OF: <br /> <br />APPROVALS: <br /> <br />CONTRACTOR: W.B. MILLER, INC. <br /> CerViX_cation by_Cc~tractoF. I certify that all items and amounts are correct for the work completed to date. <br />Signed: <br /> <br />Title: ~'~/~ Date ~'~ "J" <br /> <br />ENGINEER: HAKANSON ANDERSON ASSOCIATES, INC. <br /> <br />PE - 2 of 2 <br /> <br />-139- <br /> <br /> <br />