Laserfiche WebLink
feet of this section shall be striped for use as a trail for pedestrian and non motorized <br />traffic. <br /> <br />[n order to confine the widened roadway to the 45 foot right of way reserved for the city, <br />it will be necessary to install a bituminous berm curb along the western edge of the <br />pavement. This will also preserve the landscaped hedgerows of trees and shrubs, which <br />would otherwise need to be removed to accommodate a ditch section. The vertical grade <br />of the road way shall be approximately the same as the existing, however, this grade may <br />need to be adjusted to balance of amount of earthwork associated this the new section and <br />gradesJ The southern terminus of the roadway shall be provided with a 70 foot diameter <br />cul de sac. This is approximately 10 feet wider than the existing dirt cul de sac. It will be <br />necessary to install a storm culvert along TH' 47 to maintain the drainage from the <br />highway. A permit from MnDOT will be required for this aspect of the project as well as <br />all work within their right of way. <br /> <br />Existing driveways shall be neatly cut and repaved with like material. Disturbed turfed <br />areas on the east side of the roadway shall be restored with four inches of topsoil and be <br />seeded with a highway turf mixture. Disturbed areas on the west side of the roadway shall <br />be restored with 4 inches of topsoil and sod. <br /> <br />At the time of this writing it is anticipated that a development proposing the extension of <br />sewer and water services to property on the east side of TH 47 will cause construction <br />impacts to this project area. In the event such a project materializes the above described <br />improvements may be altered to include sanitary sewer, watermain storm sewer and <br />concrete curb and gutter. <br /> <br />ESTIMATED COSTS <br /> <br />An estimate of the costs described in the section above is detailed in Appendix C. In <br />addition to the estimated construction costs an additional 25% has been included to cover <br />the overhead cost associated with this project. These costs include; engineering design, <br />8"/,; project administration 5%; bonding and legal 2%; inspection and testing 5%; and 5% <br />fbr contingencies. <br /> <br />Should this project be modified in scope as a result of sewer and water construction, the <br />above costs will need to be appropriately modified to reflect these additional <br />improvements. However, it is proposed that the cost to the benefited properties shall be <br />held to those outlined in this report. <br /> <br />FINANCING <br /> <br />The costs have been segregated into those attributable to the construction the eight foot <br />bituminous trail, those attributable to the cul de sac, and the of grading and paving the <br />roadway. The total cost of the work is estimated to be $42,981. The.estimated cost of the <br />trail is $9,239 which is to be financed through the city's trail fund. In accordance with the <br /> <br />-161- <br /> <br /> <br />