My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/23/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 02/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:53:54 PM
Creation date
2/23/2021 10:04:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/23/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
may not be counted toward infiltration volume requirement because evaporation does not yield water <br />quality benefits, achieve groundwater recharge goals, and because it is highly variable based upon <br />climatological conditions. <br />Infiltration Facilitv Desi )n and Construction <br />The chapters on Infiltration in the Minnesota Stormwater Manual should be used as a reference in the <br />design and construction of infiltration basins for the stormwater management. This includes, but is <br />not limited to, soil borings, period of inundation, pretreatment, and protection during construction. <br />Robust pretreatment to remove suspended solids is especially important to long term functioning of <br />the practice. Infiltration rates used in design of infiltration practices shall be either those in the MN <br />Stormwater Manual (see Table 1 below) or those measured on -site by a double -ring infiltrometer. A <br />maximum infiltration rate of 3 inlhr is allowed. Rates used for design higher than those listed in <br />Table 1 below shall be verified by post -construction testing. <br />TABLE 1. Infiltration Rates for Hydrologic Soil Groups <br />Hydrologic <br />Soil Group <br />Soil Textures <br />Gravel, sand, sandy <br />gravel, silty gravel, <br />loamy sand, sandy loam <br />oam, silt loam <br />Sandy clay loam <br />Corresponding Unified Soil <br />Classification <br />GW — Well -graded gravel or well - <br />graded gravel with sand <br />GP — Poorly graded gravel or poorly <br />graded gravel with sand <br />GM — Silty gravel or silty gravel with <br />sand <br />SW — Will -graded sand or well -graded <br />sand with gravel <br />SP — Poorly graded sand or poorly <br />graded sand with gravel <br />ylylyl-www www www <br />SM — Silty sand or silty sand with <br />gravel <br />MI— Silt <br />OL — Organic silt or organic silt with <br />sand or gravel or gravelly organic silt <br />nfiltration <br />Rate <br />(in/hr) <br />1.6 <br />GC — Clayey gravel or clayey gravel <br />with sand <br />SC — Clayey sand or clayey sand with <br />gravel <br />Comprehensive Watershed Management Plan <br />Lower Rum River Watershed Management Organization <br />October 2011 IF 11 11 01 <br />0.2 <br />E-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.