My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/23/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 02/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:53:54 PM
Creation date
2/23/2021 10:04:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/23/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6115.0231 <br />MINNESOTA RULES 54 <br />B. new crossings and replacements of existing crossings comply with local floodplain <br />management ordinances, with provisions of part 6120.5700, subpart 4, item A, and with the <br />following: <br />(1) for new crossings, no approach fill for a crossing shall encroach upon a community <br />designated floodway. When a floodway has not been designated or when a floodplain management <br />ordinance has not been adopted, increases in flood stage in the regional flood of up to one-half of <br />one foot shall be approved if they will not materially increase flood damage potential. Additional <br />increases may be permitted if: a field investigation and other available data indicate that no significant <br />increase in flood damage potential would occur upstream or downstream, and any increases in flood <br />stage are reflected in the floodplain boundaries and flood protection elevation adopted in the local <br />floodplain management ordinance; <br />(2) for replacement of existing crossings, if the existing crossing has a swellhead of <br />one-half of one foot or less for the regional flood, the replacement crossing shall comply with the <br />provisions for new crossings in subitem (1). If the existing crossing has a swellhead of more than <br />one-half of one foot for the regional flood, stage increases up to the existing swellhead shall be <br />allowed if field investigation and other available data indicate that no significant flood damage <br />potential exists upstream from the crossing based on analysis of data submitted by the applicant. <br />The swellhead for the replacement crossing may exceed the existing swellhead if it complies with <br />the provisions for new crossings found in subitem (1); and <br />(3) the decks and approaches to bridges or culverts on major transportation routes and <br />on roads that provide access to development at urban densities shall be no lower than two feet below <br />the flood protection elevation as defined in part 6120.5700, subpart 5, unless it can be shown that <br />alternative routes or access can be provided during the regional flood; <br />C. the structure provides for game fish movement, unless the structure is intended to impede <br />rough fish movement or the stream has negligible fisheries value; <br />D. the structure will not obstruct reasonable public navigation. For bridges over public <br />watercourses, three feet above the calculated 50-year flood stage ordinarily satisfies navigational <br />clearance requirements. For bridges over public waterbasins or public water wetlands, and all <br />culverts, three feet of clearance above the ordinary high water level ordinarily satisfies navigational <br />requirements; <br />E. any project proposed near an existing or proposed segment of the state trails system <br />should be consistent therewith; and <br />F. bridges and walkways to islands comply with the following: <br />(1) bridges and walkways over watercourses to islands must be designed to cause <br />negligible backwater effects during floods and must be securely anchored or otherwise capable of <br />withstanding the dynamic forces of flowing water, ice, and debris; and <br />(2) permits for reconstruction of existing bridges or walkways over public waterbasins <br />and public water wetlands to islands that are intended to provide public access shall be issued only <br />if the existing crossing provides the only existing land access to the island, there is existing <br />Copyright © 2019 by the Revisor of Statutes, State of Minnesota. All Rights Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.